My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arbuckle Miscellaneous
>
CS_Courthouse Square
>
Arbuckle Miscellaneous
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:13:51 PM
Creation date
8/2/2011 2:04:50 PM
Metadata
Fields
Template:
Building
RecordID
10376
Title
Arbuckle Miscellaneous
Company
Arbuckle/Costic
BLDG Date
1/1/1998
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ i • <br />Portland General Electric Company Second Revision of Sheet No. 32-4 <br />P.U.C. Oregon No. E-16 Canceling First Revision of Sheet No. 32-4 <br />,; .;..... <br />SCHEDULE 32 (Continued) ~ ~ <br />MINIMUM CHARGE <br />The Customer Charge shall be the minimum charge applicable to Demand Level I <br />service. The Customer Charge and the Facilities Charge shall be the minimum charge <br />applicable to Demand Levels II and III service. The Company may require the <br />Customer to execute a written agreement specifying a higher minimum charge, if <br />necessary, to justify the Company's investment in service facilities. <br />MAXIMUM CHARGE <br />For billing purposes, the average rate calculated under Demand Level II or III, excluding <br />the Customer Charge, any Reactive Demand Charge, and any adjustments shall not <br />exceed 10.105¢ per kWh; however, in no case shall the bill be less than the Minimum <br />Charge. <br />REACTIVE DEMAND CHARGE <br />In addition to the charges as specified in the Monthly Rate, the Customer shall pay 50¢ <br />for each kilovolt-ampere of reactive demand in excess of 40 percent of the maximum <br />kilowatt demand during the billing month. Such charge is separate from and in addition <br />to the Minimum Charge specified. <br />SPECIAL CONDITIONS <br />The Company will transfer Customers befinreen Demand Levels I, II and III based upon <br />their recorded or estimated demand. The Company may, at its option, require demand <br />metering if the Customer's energy consumption indicates the possibility of demand in <br />excess of 30 kW. <br />If the Company's transformers are used exclusively for service to the Customer, the <br />Company may, at its option, permit installation of inetering equipment on the primary <br />voltage side of the transformers; in such case, billing will be based on meter registration <br />less a deduction of 1-1/2 percent to compensate for transformer losses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.