My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
David Hartwig <br />v1ARION COUNTY <br />100 High St. N.E. <br />Salem, OR 97301 <br />STATON CONSTRUCTION, INC. <br />29394-B AIRPORT RD. EUGENE, OR 97402-9594 <br />(54'1) 461-0543 FAX 461-0545 May 28, 1997 <br />RE: S~L,EM COURTHOUSE SQUARE, Salvage & Recycling Plan <br />Dear David, <br />As required by contract and in reference to Section 00400, 24.1. We are obligated to salva.ge, <br />reuse or recycle 90% by wei~ht, all materials removed from this project. <br />Our Plan will outline methods, techniques and resources available to accomplish this ?oal. We <br />have de~ermined that thru a concerted Qffort of ail partes involved these goals w~il be met. <br />Listed below are the estimated quantities of materials and types along with proposed aoals. <br />MATERIAL TYPE QUANITY BY MT. SAUREU/RE LANDFILL % RECYCLED <br />CONCRETE & A.C. <br />REBAR <br />STRUCT. STE~L <br />PIPE & CONDUIT <br />~N <br />COPPER & AULM ~ <br />IMBERS <br />OOD DEBRIS 9270 TONS <br />102 TONS <br />144 TONS 1 <br />60 TONS <br />8 TONS <br />7 TONS <br />180 TONS <br />2250 TONS 9270 TONS <br />102 TONS <br />144 TONS <br />57 TONS <br />36 TONS <br />6 TONS <br />180 TONS <br />1800 TONS <br /> <br />~ <br /> <br /> <br />TONS <br />12 TONS <br />1 TON <br /> <br />50 TONS 0 <br />0. <br />~ <br /> <br /> <br />C 100% <br />100% <br />~a~%~ <br />95% <br />75% <br />85o'a <br />1C0% <br />80% <br /> <br />DRYWALL <br /> <br />ROOFING <br /> <br />CARPET <br />GLASS <br />750 <br />TONS <br />0 <br />(750 TONS <br />~°~a <br />OTALS 12,811 TONS 11,595 TONS 1,1216 TONS 91°~ <br />~ As you can see we meet our estimated goais. <br />We will store the recovered materials on-site until we have sufficient quantities to transport. <br />The separation techniques utilized by our crews involve mainly heavy equipment with unique <br />attachments, buckets, thumbs, clams, munchers and cutters. <br />We will transport these materials in large volume trailers to maximize our load capability. <br />Page 1 of 2 <br />DEQ LICENSE # 12407 & 12408 OR CCB # 03371 EPA/DEQ ID# ORD980981237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.