My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Recei <br />05i28i97 11:34 $ 503 245 8894 CHRSC CONSULTRNT P.03 <br />Tra_ inin~ <br />All employees have received training as required by; <br />1926.59 Hazard Communication, and <br />1926.21 Safety training and 'education <br />1926.62(f) Respiratory Protection <br />In addition all employees receive site spec+fic training (tailgate) on specific <br />hazards and the compliance program in effect for this project <br />Signs and warnings are pasted as required by 1926.62~m} <br />1? INSPECTION BY COMPETENT PERS~N OF .lOB Sl7E, EQUIPMENT AND <br />MATERIAI, S <br />Daily inspection of the job si#e, materials and equipment shalt be made by the <br />competent person. Any deficiencies noted as we11 as the action taken shall be noted in <br />the daily job iog. <br />'t3. AVAII.ABILITY OF WRITTEN PROGRAMS <br />7his compliance plan as well as the daity job log wil{ be availabfe far inspection <br />by autharized personne! at the job site. <br />14, WRITTEN PROGRAMS UPDATE <br />This project is not expected to extend beyond 6 months duration. Far some <br />reason, if it does extend beyond that period it will be reviewed and updated if needed. <br />Compliance plan approved by: GompEiance plan drawn up by: <br />~. ' ~ ., ~ 1 <br />Staton Construction North st Envirocon, I c. <br />Ron Richey, Competent Persan David D. Coward, CIH <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.