Laserfiche WebLink
-5- <br />B(b). Uuring warm weather conditions, any protective suits <br />required to be worn will be the "breathable" type (e.g:, <br />Kimberly Clark "K1eenGuard"). An ample supply of water, <br />and shaded rest areas, will be made available. Workers <br />will dress down and take a 5-10 minute break at least <br />once every hour. Site supervisors will continuously <br />monitor all workers f or signs of over-heating (symptoms <br />discussed in Medical Surveillance section). <br />IV. Protective Equipment. <br />All employees engaged in work activities where contact with <br />fixtures, or debris potentially contaminated by wood treating <br />products will wear chemical protective gloves. <br />Suitable work boots, with puncture-resistant soles, will be <br />worn by all persons in the work area. <br />Appropriate eye and/or face protection will be worn during a'l1 <br />torch cutting operations. <br />Hard hats will be worn at all times while within the work area. <br />Suitable hearing protection equipment will be worn by all <br />workers potentially exposed to noise levels in excess of <br />current OSHA standards (85 dB; 8 hr Time-Weighted Average). <br />Applicable ~ermissible Exposure Limits (PELs) are not <br />anticipated to be exceeded during any of the demolition <br />operations. However, as a precaution. the following <br />respiratory equipment will be utilized: <br />(1) Workers engaged torch cutting operations will wear <br />disposable respirators approved for protection against <br />dusts. mists, and welding fumes. <br />(2) If dusty conditions result during demolition operations <br />te.g., tearing out of concrete; jack hammering of <br />concrete), potentially exposed workers will wear nuisance <br />dust masks. <br />V. Training: Because this project does not involves the cleanup <br />of materials classified as hazardous wastes, employees working <br />on this project are not required by regulation to have <br />completed a certified 40 hr Hazardous Waste Worker training ~ <br />program. However, project contract specifications do reguire <br />that all site workers have completed a 40 hr hazardous waste <br />worker training program. <br />