My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-s- <br />VI. Medical Surveillance: All HazMat-trained employees working on <br />this project receive an annual occupational health medical <br />examination. As this is not considered a hazardous waste <br />cleanup site, workers are not required to have this routine <br />medical screening. ~ <br />Medical examinations, and f ollow up medical surveillance (if <br />required) will be provided to any employee for whom a known~ or <br />reasonably suspected, a chemical overexposure has occurred. <br />All workers will be continuously monitored, by site <br />supervisors, for signs of over-exposure. During warm weather, <br />all employees will also be continuously monitored for symptoms <br />of heat stress: <br />HEAT CRAMPS: Painful muscle spasms; affected worker will be <br />instructed to take a 30 min break, drink fluids, and cool <br />down until symptoms subside. If symptoms persist, or re- <br />vccur, worker will be relieved from further activity for the <br />day. <br />HEAT EXHAUSTION: Grayish skin, f aintness or dizziness, cold <br />clammy skin, dilated (wide open) pupils; worker will be <br />removed to a shaded or cool rest area and instructed to <br />drink fluids. When stable, the individual will be <br />transported home. <br />HEAT STROKE: Dry hot skin possibly with reddening, vsry high <br />body temperature, possible uriconsciousness, constricted <br />(small) pupils, A TRUE MEDICAL EMERGENCY; worker will be <br />brought to a shaded or cool area. Water, wet towels, and/or <br />ice will be placed on body to lower body temperature. <br />Emergency medical assistancs and transportation will be <br />summoned immediatelq, <br />VII. Monitoring: Field monitoring is not required for this project. <br />Staton personnel will be responsible for inspecting the dip <br />tank components, and underlying soils, as disassembly proceeds <br />for any signs of gross ~levels of residual wood treating product -'-' <br />contamination. .If such contamination is detected, care will be ~~: <br />taken to avoid contact with the affected materials, and the <br />situation will be immediately reported to Staton supervisors~ <br />and designated Weyerhaeuser officials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.