My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction: Staton Construction
>
CS_Courthouse Square
>
Construction: Staton Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:16:05 PM
Creation date
8/2/2011 2:55:56 PM
Metadata
Fields
Template:
Building
RecordID
10108
Title
Construction: Staton Construction
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />respiratory protection plan. <br />HAZARD CONTROL (PROTECTIVE CLOTHING): <br />Protective clothing will be used to protect lead from contacting <br />employee street clothing, skin or hair. The standard applies <br />whenever employees are exposed to lead above the PEL and where <br />there is exposure to lead compounds that may cause skin or eye <br />irritation. This clothing is provided at no cost to the employee <br />on a daily basis. In addition, eye and hearing protection will also <br />be provided at no cost to the employee. Protective clothing will be <br />left on site at the end of each work day and disposed of with <br />demolition debris. ~ <br />AIR MONITORING• <br />Air monitoring •is required by 29 CFR 1926. 62. The requirements call <br />for initial monitoring to determine if demolition activities will <br />produce emissions with lead concentrations above action levels. <br />The standard provides for the use of previous air monitoring data <br />(from similar projects the contractor has done) or objective data <br />which demonstrate that air monitoring is not needed. If new <br />equipment , processes or personnel are used on this project <br />additional air monitoring must be conducted if there is a <br />possibility of exposure. Employees must be notified of the results <br />of all air monitoring within 5 working days of the completion of <br />air monitoring. Staton Construction will conduct air monitoring in <br />full compliance with the requirements of 29 CFR 1926.62. <br />ADMINISTRATIVE CONTROLS: <br />This control means utilizing job rotation to reduce employee <br />exposure to below the 8 hr. TWA indicated in the standard. Although <br />allowed by 29 CFR 1926.62, Staton Construction will generally not <br />utilize job rotation because of peak or episodic concentrations of <br />lead and other contaminants on the job. When work schedules or <br />other safety hazards such as heat, require short workdays, or job <br />rotation is used to achieve compliance with the standard, the <br />following resource will be maintained as a part of the project <br />records and made available to employees on site: <br />~ Name of each affected employee. <br />• Donation & exposure level, each task/each employee. <br />• Description of each employees' task. <br />• BLL monitoring for affected employees. <br />INFORMATION, TRAINING, NOTIFICATION: <br />All employees on this project will be trained under the hazard <br />communication standard (1926.59). Employees will also be trained on <br />any specific safety hazards as specified in 1926.21. <br />All employees will receive site specific training (tailgate) on <br />specific hazards and the compliance program in effect for this <br />proj ect . <br />
The URL can be used to link to this page
Your browser does not support the video tag.