Laserfiche WebLink
FEE SCHUDULE JR ENVIRONMENTAUENGINEERlN~ .. REl.A7EC? SERVtCES <br />EXHIBlT "A~> <br />E~'FECTIilE FEBRUARY 27~ 1995 <br />`fhis schedule subJect fd chatt~e <br />Tho compensation for wark done on the basis of technical $nd professional services plus incurred <br />expenses will be estabfished using tha tates ~s set forth b~low: <br />A <br />B, <br />C. <br />D. <br />TECHNICAL AND PROFESSlbNAL SERVICES <br />Principal <br />Program Manayer <br />EngineerlScientist 7 <br />Engineer/Sctentlst 5fi <br />Engineer/Saentisf 3-4 <br />Engineer/Scientist 1-2; Senior 7'ectznician; Senior CAD Uperetor <br />TechnicaNCAD Opsrator ~ <br />Project Assist~nt <br />TRAVEL AND SUBSISTENCE <br />Markup applied to travel and subsist~nce is gssessad at a tlat rate of 15%. <br />OUTStDE EXPENSES <br />~ <br />125.OQ <br />105.00 <br />88.00 <br />72.00 <br />60.00 <br />50.00 <br />45.00 <br />40.00 <br />Any outside expenses ([ncludin~ subconsultant and subconVador services) incurred for this <br />project by Century West Engineering will be charged at the actual cost of the expec-se ptus 15%. <br />IN-HOUSE EXPEN5ES <br />Equ~ment Expenses: <br />Combustible Gas Meter <br />CelluSar Talephone <br />Organic Vapor Detector <br />Hand Auger <br />Vehicle Miiea~e <br />Soil c3as Probe <br />Profective Equip. <br />Sampiing Pump <br />Data Logger <br />Photocopy <br />Fax Machine <br />$ 50.OOldsy <br />15,QO/day ~ <br />50.OOlday <br />. 50.001day <br />.60/mile <br />50.oaaay <br />20.OO/day <br />50.0Q/day (150.OO1wk max.} <br />100.00lday <br />.10/copy <br />1.00/pape <br />(.aboratory ExpensesE;. <br />Tests, equlpmertt, suppiies, and services provided by century West's in-houss laboratories will be <br />charged at the labo~atory prir.es current at the time these expenses are incurred. <br />~nsurance Certifi~ate forNam~d nsureds: $:100.OOtyear <br />H:~sr,are~onl~na~cxnlb.amr ov22/9s <br />