My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOC Files (Folders 1-3)
>
CS_Courthouse Square
>
BOC Files (Folders 1-3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:07:50 PM
Creation date
8/2/2011 3:23:53 PM
Metadata
Fields
Template:
Building
RecordID
10068
Title
BOC Files (Folders 1-3)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r~ • <br />t. , <br />sharing for the acquisition appraisal, relocation of <br />businesses on the block, and demolition services to clear <br />the block will also use the land acquisition percentage <br />(31.29%). <br />~ <br />~-~ <br />~_ ~~ <br />I <br />~..,, <br />F <br />~~ <br />~,. <br />t <br />1 <br />i_~ <br />~,.~ <br />~' <br />~~ <br />Construction Related Costs: The cost estimators, <br />Architectural Cost Consultants (ACC), of Portland, <br />prepared a cost estimate for the entire project based on the <br />completed design development plans and specifications. At <br />our direction, ACC prepared a floor by floor, item by item <br />breakdown of the costs as they pertained to the county <br />and/or transit elements of the project (The relationship of <br />transit's and the county's useable square footage (20.07%) <br />determined the portion of the common space costs which <br />would be assigned to transit) That estimate is attached to <br />this document On the basis of that estimate, we are able <br />to detersnine the relationship of the transit costs to the <br />total project costs. (See the attached chart) This <br />percentage (31.42%) is the portion of all construction <br />related invoices which will be paid by transit, including <br />architecture and engineering; project management; fees, <br />permits, and insurance; and construction hard costs. We <br />do not expect the cost relationship to change; however, to <br />further verify the percentage another estimate will be <br />prepared by ACC when the construction drawings and <br />spec~cations are complete and they will also spot check <br />the key elements against the bids, when received. Should <br />- the CD estimate change the cost-sharing percentage, we <br />will so advise FTA. In the meantime, however, invoices will <br />be paid according to the 31.42% formula and adjusted <br />later, if necessary. <br />Note: Salem Area Transit is the paping agent for the <br />entire project, thereby providing us the opportunity to <br />closely track all invoices, payments, and cost <br />allocations. <br />Special Considerations: Some special services have been <br />contracted because of requirements imposed by FTA or <br />because of the unique nature of the integrated <br />development. In addition, some costs were incurred in <br />project management and design which are n:ot being <br />Ch2 Cost Allocation <br />09/29/98 <br />76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.