My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOC Files (Folders 1-3)
>
CS_Courthouse Square
>
BOC Files (Folders 1-3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:07:50 PM
Creation date
8/2/2011 3:23:53 PM
Metadata
Fields
Template:
Building
RecordID
10068
Title
BOC Files (Folders 1-3)
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Considerations Cost Sharing: <br />L <br />Berrep Settlement ~ <br />28% of fee and actual reimbursable expense. This is the percentage of <br />the original project design attributable to Transit. <br />Fee $360,000.00 ~ <br />Reimbursable <br />Total Due <br />28% Transit <br />3,413.15 <br />$363,413.15 <br />$101,765.68 <br />Pence-Kellv <br />28% of value engineering and cost estimating services on the original <br />design. <br />$67,687.13 x 28% _ $18,952.40 <br />•° : <br />~~ <br />.; <br />r` ~ <br />r <br />„ <br />~: <br />~ <br />~.A <br />i , <br />Melvin Mark Proiect Mana~ement <br />Transit will pay its 31.42% of the RFP Project Management Agreement, <br />dated 4/ 16/98, as per the cost allocation model based on its current <br />percentage of the total project construction costs. However, Marion <br />County has a separate addendum to the above agreement, also dated <br />4/ 16/98 for pre-construction services in which Transit is not a paying, <br />participant. <br />Arbuckle Costic Architects <br />28% of cost of architectural and engineering services on original design. <br />$458,902.29 x 28% _ $128,492.64 <br />Streetscape <br />In the event_that Salem Urban Renewal does not cover all the costs of <br />street~cape as designed, and the County and Transit agree that such <br />elements are necessary to the project, those additional costs will be <br />shared between Marion County and Transit in the same relation as <br />ownership of the land, 31.42% Transit and 68.58% County. The four <br />block faces to be developed with streetscape relate to the ownership of <br />the whole parcel not just to the prorata share of development within the <br />parcel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.