<br />1thOUSe Squat'e --- -----
<br />Architectural Cost Consultants, LLC -------- -_ __ .--
<br />Eslimate Date: R 03-Dec•98
<br />& High Street Jamea A. Jerde, AIA - Stenley J. Puczolkowaki, AIA Document Deta: 29-Oct-98
<br />, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98
<br />cle Costic Archkects, Inc PoAland, Oregon 97221 Print Time: 11:07 AM
<br />ontrect Documenls Eatimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Sprina 99
<br />~ DIRECT CONSTRUCTION COST - PARTNERS SUMMARY I
<br />Component Area Bldg S 8 C Conference Ctr. County Solid Waste Transit Parking Bus Mall Streetscape Totals Comments
<br />Building Shell & Core 152,792 sf 11,308,712 0 0 25,989 _.._ 0 0 0 ~O;i~
<br />Parking 71,979 sf 0 0 457,677 ~ 0 2,416,574 0 0 53,331,929
<br />Bus Mall 66,528 sf 0 0 0 0 0 0 s2,175,371
<br />Street Scape 35,650 sf 0 0 0 0 0 0 0 1,789,777 ~;~,~'
<br />Tenant Finishes
<br />County 85,725 sf 0 0 1,795,699 0 0 0 0 0 51,795,699
<br />Transit 17,784 sf 0 0 0 0 692,788 0 0 0 S692,788
<br />Solid Waste 5,866 sf 0 0 0 148,190 0 0 0 0 5148,190
<br />Conference Center 4,951 sf 0 278,264 0 0 0 0 0 0 ,>~4
<br />TOTAL DIRECT CONSTRUCTION COST 11,308,712 278,264 2,279,366 148,190 1,176,455 2,416,574 2,175,371 1,789,777 21,572,709
<br />cost / sf $74.01 $56.20 $26.59 $25.26 $66.15 $33.57 $32.70 $50.20
<br />Building Shell & Core ;11,308,712
<br />Parking 52,416,574 '
<br />Bua Mall 52,175,371
<br />Street Scape 51,789,777
<br />County S2,279,366
<br />Trensit ;1,1~6,455
<br />Solid Waate S148,190
<br />Conference Center 5278,264
<br />521,572,709
<br />ALTERNATES Bld S 8 C Conference Ctr. Coun Solid Waste Transit Parkin Bus Mall Streetsca e Totals
<br />1 Paricing Altemate 1 22,092 sf 0 0 6,485 0 975,28 0 0 5988,271
<br />2 Parking Altemate 2 19,487 sf 0 0 0 0 0 849,921 0 0 5849,921
<br />3 0 sf p
<br />4 0 sf p
<br />The above estimates are for direct construction cost only. They do not inGude fumishings & equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and
<br />removal, financing costs, nor any other nortnally associated development costs.
<br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major sub-trades as well as the general contractors. All work to be contracted at one time
<br />(shell & core, street & bus mall and tenant improvements). If project is to be phased, additional cost associated with phasing to be added.
<br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed beyond this date, the estimates must be indexed at a rate of 2 to 4% per year compounded.
<br />Partner Summary ~ ~
<br />~ ~ ~