My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Art Work
>
CS_Courthouse Square
>
Art Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:01:15 AM
Creation date
8/3/2011 8:33:44 AM
Metadata
Fields
Template:
Building
RecordID
10081
Title
Art Work
Company
City of Salem Community Development Dept
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 12, 1999 <br />Billy F. Wasson <br />Counhouse Square. Manage~ <br />Marion County Annex <br />3150 Lancaster Dr. NE ` ~ ' <br />Salem, OR 97305-1398 <br />Courthouse Square Urban Renewal Agency Participation <br />Dear Mr. Wasson, <br />CITY <br />OF SALEM, <br />OREGON <br />City Hali / 555 Liberty St. S.E. <br />Zip Cpde 973pt <br />CITY MANAGER'S OFFICE <br />Telephone (503) 588~255 <br />The construction bid appendix sheets for the elements of Agency participation in the <br />Courthouse Square project were received Friday, February 5, 1999. We have reviewed and <br />compared the six bids and associated line item detail. While Pence/Kelly Construction, Inc. is <br />the apparent low bidder for the total Courthouse Square project they are also the high bidder for <br />the elements of Agency participation. Anticipating this condition could arise, our agreement, <br />which remains to be signed and returned for my counter signature, provides the fotlowing: <br />Prior to construction contract bid award for the items of Agency participation, the <br />low bid recommended for award by the County and Transit District shall be <br />submitted to the Agency. The Agency will designate in writing within five (5) <br />days of submission, acceptance, rejection or designation of bid alternate for <br />which the Agency will provide participation. Agency approval for participation will <br />not be unreasonably withheld, however, reasons for withholding of such approval <br />shall include but not be limited to bid irregularity or unreasonable unit cost. <br />Agency acknowledges that the low bidder for the entire Project construction may <br />not necessarily represent the lowest bid tendered for each of the specific areas <br />of Agency participation designated in Section 1, however, in the event the <br />Agency finds unit cost to be un~easonable, Agency may designate an acceptable <br />level of participation for the respective item. <br />After adjusting for the Agency maximum participation in weather protection of $160 per lineal <br />foot, the base bid for all elements of Agency participation tendered by Pence/Kelly is <br />$1,314,979. By comparison, the other five bids range from a low of $821,g10 to a high of <br />$1,003,695. <br />As you will recall in a meeting held with our staff on February 3,1998, this very condition was <br />discussed. It was concluded, to determine an "acceptable level of participation" for the Agency, <br />a comparison would be made to an amount of 120% of the median price of all bids. The <br />attached schedules enumerate all bids, the median, and a value representing 120°/a of inedian. <br />~ <br />- s.w~ a.o,~, - <br />~LL•~~K1YC~ CA~ <br />i' ~~ • <br />ATTACHMENT B <br />,..,.,..~ <br />~. <br />-- AN EQUAL OPPORTUNITY EMP <br />
The URL can be used to link to this page
Your browser does not support the video tag.