Laserfiche WebLink
5.) Maintenance/warranty @ $600.00 <br />6.) Permit @ $ 45.30 <br />Total labor costs @ $7,345.30 <br />1. PROJECT TOTAL QUOTATION: <br />Total equipment net price @ $36,389.00 <br />Total labor costs ~a $ 7 345.30 <br />Project Cost $43,734.30 <br />(Project list price $55,863.00) <br />ADD Alternate # I <br />Provide CCTV submix and control for local broadcas!~ ,/ <br />Three (3) Biamp 801 mixers, 8 channel i(/ <br />One (1) 24 channel subsnake class 2P ~~ <br />One (1) Horizon 911CB AC distribution <br />Three (3) label strips <br />Three (3) connect bays Biamp CP <br />Labor to install <br />*Installed price @ $4,001.00 <br />~~ ~2~ <br />~~ <br />ADD alternate #3 <br />Provide provisions in mixing system for future teleconferencing. Mixer upgrades <br />only. No extra teleconferencin~ equipment included at this point, only mixer capabilities <br />for future. <br />Three (3) IRP 8x2 teleconferencing automixers with voice matic, level matic, <br />TEQ, TCA. Manufacturer: IRP TA4080 <br />*Total upgrade cost @ $720.00 <br />~ Timeline <br />Contractor can be substantially complete with senator hearing room audio project <br />within 45 days A.R.O. <br />