My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ' PENCE/KELLY <br />CONSTRUCTION, INC. <br />~ 7J47 P~.~ LooP SE. Sal~m, OR ~7707 (607) ~~D-7727 <br />vom.,,e ~eo» z~sase~ p., ~sw~ srsasn <br />cC~ r ~ws <br />Meeting Minutes <br />No. 09 <br />Project Manager: Dave Hays <br />~ . . ~ . . - ~ : • • <br />K06.02 OLD 5/20/99 Salem Area Transit JW <br />VE #1 (eliminate "Low E" from Skylights) has no architectural cost. Leonard has approved, John W. is <br />reviewing. 6/3/99 - John will have a response by Monday. <br />6/10/99 - VE #1 has been approved <br />VE#2 Revises section of bus duct to conduit and wire. (Under owner review.) VE #2 has been approved. <br />L00.00 OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />MISCELLANEOUS <br />L09.02 NEW 6/10/99 Pence/Kelly Construction, Inc. DH <br />The percentage fee on Change Orders has been proposed by Dave. John and Billy are reviewing the <br />proposals with their councils. Dave would like to get this issue resolved by the first of next week because it <br />is slowing the paper process. <br />M00.00 OLD 4/23/99 PencelKelly Construction, Inc. JG <br />PARTNERING <br />M00.04 OLD 516/99 Salem Area Transit JW <br />A 40% (P/K) - 60% (Owners) split for VE has been approved. Cost split will be done after design cost are <br />subtracted. VE items will be tracked in a VE log. <br />5/27/99 - John W. is seeking approval of Salem Transit Board. <br />M07.01 O~D 5/27/99 Pence/Kelly Construction, Inc. DH <br />Billy asked Pence/Kelly to proceed with changes on Parking Stalls. P/K will proceed with facilitating 6 <br />parking stalls on Chemeketa Street. Must have visible progress on this before next business forum on 4 <br />June. Cost is $33,326 P/K to provide date when stalls must be taken back. <br />Prepared By: Pence/Kelly Construction, Inc. <br />Signed: <br />John Gremmels <br />Dated: 6/15/99 <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.