My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~P'ENCE/KELLY Meeting Minutes <br />CON$TRUCTION~ INC. NO. SS <br />!~a r.nw i.een si. sw~ aarws ~eoa~ »~.rm <br />~~""~' F~ ~0" °~6'47 project Manager: Dave Hays <br />~ . . ~ . .- ~ :• ~ • <br />~Z•~~ OLD 10/25/00 O on Cascade Plumbin 8 Heatin DV <br />Toilet Sensors need to be adjusted. <br />11/1100 - Sensors installed today <br />11/8/00 - Is the water presure to great at sinks? Toilets? <br />11/9/00 - P/K, Interface and Bob McCune will meet with OCPH and sink sensor rep to resolve this issue. <br />H~•~ OLD 4H4/99 Pence/Kel Construction, inc. .J~ <br />ELECTRICAL CONCERNS <br />ln~•~~ OLD 11/1/00 Pence/Kelly Construction~ Inc. JG I <br /> Streetscape Transformers are on order. P/K will get ETA. ~--~ ~'~- ~ <br />`~~./. r... i~e .~ <br />Transformeres are on every other pole. ECC is searching for a transformer that will fit. The transformers <br />that were originally speced will not fit inside of poles. <br />~~•~ OLD 4/14/99 Pence/Kell Construction, lnc. JG <br /> SUBMITTAL REVIEW <br />~~•~ OLD 11/8/00 Pence/Keli Construction, Inc. JG <br /> CLOSEOUT <br />~~~~ OLD 11/8/00 Electrical Construction Company PBS <br /> Electrical As Builts are beign redone by ECC <br />~~•02 OLD 11/8/00 ArbuCkle CO8tiC ArChiteCts LL <br /> Electrical and Mechanical O&M's are being reviewed by A/C <br />184.03 OLD 11/8/00 Arbuckle Costic Architects LL <br /> Mechanical, Underground, and Firesprinkler As-bults are under review by A/C <br />~~•~ OLD 11/8/00 Pence/Kell Construction~ Inc. JG <br /> General 08M manual will be tumed over for review by 11/16 with index of manuals and required warrenties <br />184.05 OLD 1118/00 Pence/Kell Construction, lnc. JG <br /> Prefunctionai Checklist - Complete by Trane, will be reviewed by P/K before tumover. Expect by 11/16 <br />~~•~ OLD 11/8/00 Pence/Kell Construction~ Inc. JG <br /> Turnover Items. List complete. P/K stiil owes 1 change of filters, and stock of paint. Expect by 11/16 <br />~~•07 OLD Pence/Kell Construction, Inc. JG <br /> GC Lein Waver forms are under wo~lc by P/K. Expect by 11/16 <br />185.01 NEW 11H5/00 Ore on Cascade Plumbin & Heatin DV <br /> Trane has begun trending logs. <br />185.01 CLO 11/15/00 Pence/Kell Construction, Inc. JG <br /> ECC has left 10 extra cases of lamps in stock room for Building Maintenance to install as required. <br />J00.00 OLD 4/14/99 Pence/Kel Construction, Inc. JG <br /> RFI REVIEW <br />J00•01 OLD 4/14/99 Pence/Kell Construction, Inc. JG <br /> The RFI log is closed <br />K00.00 OLD 4/14/99 Pence/Kelly Construction, lnc. JG <br />ISSUE 8 VE REVIEW <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.