Laserfiche WebLink
f ~~ <br />~~ PENCE/KELLY ~ ~ <br />~ CONSTRUCTION, INC. <br />~.~.~. ~ ~. _.~«~. ~.~ ,~, ~..~ <br />~b (~) ~1 Fax (503) 686-747~ <br />«o..a~as <br />~~ ~"`~'r`'~" Meetin Minutes <br />~ 5~3~ ~`t - ~588 g <br />No. 86 <br />Project Manager: Dave Hays <br />Courthouse Square MEETING DATE: 11/16/00 <br />LOCATION: Courthouse Square SUBJ~CT: Construction Meeting <br />. <br />• • <br />Y <br />~ <br />BW <br />• . • <br />Bill Wasson <br />. .. . <br />Marion Coun <br />Y BMC Bob McCune Marion Coun <br />Y BC B ron Courts Melvin Ma~lc Com anies <br />Y CL Crai Lewis Melvin Mark Com anies <br />N DH Dave Ha s Pence/Kell Construction, Inc. <br />Y JH Jeff Hamm Salem Area Transit <br />Y JG John Gremmels Pence/Kell Construction, Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />N O Oliver Raab P.E. Interface En ineerin , Inc. <br />Y RC Rand Curtis Marion Coun <br />N SS Steve Schaad Pence/Kell Construction, Inc. <br />N TT Tim Terich Centu West En ineerin <br />~ . . ~ . .- ~ :~ • - <br />A~•~ OLD 4J14/99 Pence/Kelly Construction~ Inc. JG <br />PERMIT STATUS <br />A86.01 NEW 11/2/00 Pence/Kel Construction, lnc. JG <br />Electrical Permit. Jim Cook at Interface has spoken to Bill Whiteside at the City, explained that a U.L. listed <br />EF unit, such as required on this project does not exist. Components within the EF's are U.L. listed. Bill said <br />that might be enough. <br />B~•~ OLD 4/14/99 Pence/Keli Construction, Inc. JG <br />SCHEDULE REVIEW <br />~•~ OLD 4/14/99 Pence/Kell Construction, inc. JG <br /> CIVIL CONCERNS <br />E~•~ OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br /> STRUCTURAL CONCERNS <br />E85.01 CLO 11H5/00 ArbuCkle CO8tiC ArChiteCts LL <br /> Carison Testing will conduct the deflection test on the busmall deck <br />F~•~ OLD 4/14J99 Pence/Kelly Construction, Inc. JG <br /> ARCHITECTURAL CONCERNS <br />F83.02 OLD 11H/00 Pence/Keliy Construction, Inc. JG <br /> Signage: <br />- Plaques: Enamel Wash didn't work. <br />- Kiosk frames - Installed <br />- Interior Signs: Cambell will produce in house, will start today. <br />F84.01 OLD 11/8/00 Arbuckle CostiC Architects LL <br /> LL to evaluate streetscape medallions. Include in punch list if necessary <br />G~•~ OLD 4/14/99 Pence/Kelly Construction, Inc. JG <br />MECHANICAL CONCERNS <br />Page 1 of 3 <br />