My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />~ 363 Stzte Street <br />Salem, Oregon 97301-3533 <br />(503) 581-41 I 4, Fax (503) 581-3655, E-mail: architects@arbucklecostic.com <br />' <br />' <br />~ <br />CERTIFICATE OF <br />suss-ra~Tia~ <br />COMPLETION <br />PROJECT: Courthouse Square ARCHITECTS 9828 <br />555 Court Street NE PROJECT NO.: <br />Sa~em, Oregon 97301 <br />CONTRACT FOR: <br />General <br /> Construction <br />OWNER: Marion County and Salem Area Mass Transit CONTRACT DATED: February 17, 1999 <br />100 High Street NE District <br />Salem, Oregon 3140 Del Webb Ave NE <br />97301 Salem, Oregon 97303-4165 <br />CONTRACTOR: Pence/Kelly Construction, Inc. <br />2747 Pence Loop SE <br />Salem, Oregon 97302 <br />DATE OF ISSUANCE: September 27, 2000 <br />PROJECT OR DESIGNATED PORTION SHALL INCLUDE: All work as required by construction documents dated <br />December 30, 1998, Addendum Nos. 1, 2, and 3, Change Orders 1 through 25, and current proposal requests. <br />The Work performed under this Contract has been reviewed and found, to the ArchitecYs best knowledge, information and <br />belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or <br />designated portion thereof is sufficiently complete in'accordance with the Contract Documents so the Owner can occupy or <br />utilize the Work for its intended use. The date of Substantial Completion of the Project o~ portion thereof designated above <br />is hereby established as September 27, 2000 which is also the date of commencement of applicable warranties required by <br />the Contract Documents, except as stated in the attached punch lists: <br /> Dated <br />Field Original Date: Current Revision Description: <br />Observation Date: <br />Report No. <br />28R (1) July 27, 2000 September 6, 2000 Punch List for Second Floor Tenant Areas <br />29R (1) August 8, 2000 September 8, 2000 Punch List for Third Floor Tenant Areas <br />30R (1) August 16, 2000 September 15, 2000 Punch List for Second and Third Floor Core Areas <br />31 R(1) August 22, 2000 September 14, 2000 Punch List for Fourth Floor Tenant Areas <br />32 August 22, 2000 Supplemental Punch List for Second and Third Floor <br /> Tenant Areas <br />33 August 24, 2000 Punch List for the Hearing Room <br />34 August 25, 2000 Punch List for the Roof Areas <br />35 September 1, 2000 Punch List for Fifth Floor West Tenant Areas, <br /> (Transit Administrative Offices) <br />36 September 14, 2000 Punch List for Fourth Floor Core Areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.