Laserfiche WebLink
COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />HELD OBSERVATION REPORT NO. 42 <br />October 9, 2000 <br />Page 2 of 2 <br />to be repainted. ~ <br />I. Between second floor and ground floor there is a lot of dust adhered to the south wall. This needs to be <br />removed before the final coat of paint is applied to the stairwell. This also occurs on the north wall near <br />the ground floor. <br />m. Significant paint overspray on the ground floor landing onto the wall that needs to be repainted. Paint <br />overspray onto transition strip befinreen steel floor and vinyl that needs to be cleaned up. Paint overspray <br />at gate to lower level needs to be cleaned up. There is insufficient paint coverage on the hardwa~e for the <br />gate. <br />n. At the pa~lcing level, general clean up needs to be provided to remove paint overspray and other <br />co~struction debris. <br />6. Stare S141: <br />a. Paint generally incomplete. <br />oc: Billy Wasson, Marion County <br />John Whittington, S.A.M.T.D. <br />Craig Lewis, Melvin Mark Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />File <br />- - - _ .. - - File: 982&9A <br />This oo~'irtns and records our interpretation of the discxissions which ocxuRed and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpreta6on or description is inoomplete or inaaxirate. <br />