My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITE g00M N0./ <br />REMP'RKS COMPLETE <br />ND LOCATION D <br /> this area. <br /> Parking Replace noisy ballast in type A2luminaire by Grid 6 and <br /> Northwest between Grids E& F <br /> P195 <br /> Parking Type X2 exit sign at door to Stair 5199 is not installed. <br /> Northwest Provide luminaire. <br /> P195 <br /> Parking Replace broken cover for receptacle on Grid A and between <br /> Northwest Grids 4 & 5 <br /> P195 <br /> Parking Provide label for EF-5 Disconnect switch mounted near door <br /> Northwest to Air P198 <br /> P 195 <br /> Parking Complete the installation of the interior lighting controller <br /> Northwest override switches at door to Stair S199 <br /> P195 <br /> Air P197 This area was locked and therefore I was unable to inspect <br /> this area. <br /> Air P198 This area was locked and therefore I was unable to inspect <br /> this area. <br /> Water Service This area was locked and therefore I was unable to inspect <br /> P201 this area. <br /> Air P209 This area was locked and therefore I was unable to inspect <br /> this area. <br /> Parking Complete the installation of the interior lighting controller <br /> Southeast override switch at door to Lobby P240 <br /> P225 <br /> Parking Complete the installation of the interior lighting controller <br /> Southeast override switch at door to East Stair 5256 <br /> P225 <br />i <br /> Parking Complete the installation of the Type A2luminaire near <br /> Southeast Grid 12a and between Grids M& N <br /> P225 <br /> Parking Replace noisy ballast in type Al luminaire located <br /> Southeast northwest of the intersection of Grids 11 & M. <br /> P225 <br /> Parking Replace lamp in type A2luminaire located on Grid H and <br /> Southeast between Grids 10 & l0a <br /> P225 <br /> Parking Replace lamp in type A1 luminaire located on Grid 9 and <br /> Southeast between Grids J& K <br /> P225 <br /> Parking Replace noisy ballast in type A2 luminaire located north of <br /> Northeast Grid 5 and between Grids H& J. <br /> P225 <br />We are proceeding with the project based on the above statements being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation Reports~lVl+E Punch lists\Elect Site Visit Report7.doc Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.