Laserfiche WebLink
I N T E R F A C E E N G I N E E R I N G <br />Consultlnp Engineers <br />200 Hawthorne Ave, SE #B- <br />210 <br />Salem, OR 97301 <br />503.364.5354 OFFICE <br />Site Visit Report <br />PROJECT: Courthouse Square PROJECT 1996-0570 <br /> NUMBER: <br />SITE VISIT DATE: September 12, 2000 SITE VISIT <br /> NUMBER: <br />AR.CHITECT: Arbuckle Costic Architects, PC <br />REVIEWED BY: Brian Baldwin <br />PARTIES PRESENT: Brian Baldwin <br />~ Mechanical ^ Fire/Life ^ Plumbing ^ Electrical ^ <br />Safety Other: <br />ITE ROOM NO./ COMPLETE <br /> REMARKS <br />~ LOCATION D <br />N <br />1 Vestibule 8" ~ CD-4 is broken. Re lace. <br />2 1235 24 x 24 CRG-1 not installed. Install ille. <br /> g~~ ~ CEG-2 and 12 x 12 CTG-2 are not installed. Install the <br />3 Storage 1234 'lles. <br />4 Stora e 1283 6" Q1 CD-1 not installed. Install the diffuser. <br />5 Audio Visual Thermostat for TU-1-8 not installed. Install the thermostat. <br /> 1253 <br /> Assembly 6" ~ CD-6 as installed has incorrect throw. Inata112 <br />6 1233 diffusers, 2-wa , with throw as de icted. <br /> Conference Thermostat for TU-1-2 is installed incorrectly. Correct the <br />7 1160 installation. <br />8 Elevator Thermostat for TU-1-3 not installed. Install the thermostat. <br /> Lobb 1240 <br /> Main Lobby Thermostat for FPB-1-6 not installed. Install the <br />9 1200 thermostat. <br /> Thermostat for FPB-5-18 not installed. Install the <br />10 Office 5209 thermostat. <br />11 East Stair 14 x 6 SG-1 not installed. Install the grille. <br /> 5256 <br /> Conference Thermostat for TU-5-13 not installed. Install the <br />12 5252 thermostat. <br />13 Conference 24 x 24 CRG-1 not installed. Install the grille. <br /> 5174 <br />We are proceeding with the project based on the above statements being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation Reports\M+E Punch lists\m091200site.doc Page 1 of 1 <br />