Laserfiche WebLink
INTERFACE ENGINEERING <br />Consulting Engineers <br />200 Hawthorne Ave, SE #B- <br />210 <br />Salem, OR 97301 <br />503.364.5354 OFFICE <br />503.364.5434 FAX <br />Site Visit Report <br />PROJECT: Courthouse Square - Salem Transit Center PROJECT 1996-0570 <br />NLTMBEft: <br />SITE VISIT DATE: 9/07/00 thru 9/12/00 SITE VISIT <br />NUMBER: <br />ARCHITECT: Arbuckle Costic Architects <br />REVIEWED BY: Stephen Stoneking <br />FIFTH FLOOR FINAL SITE VISIT/PUNCH LIST <br />^ Mechanical ^ Fire/Life ^ Plumbing ^ Electrical ^ <br />Safety Other: <br />ITE g00M NOJ <br />REMARKS COMPL~TE <br />~ LOCATION D ` <br />N <br />1 Planning Photocell not installed <br /> 5175 <br />2 Con£ 5174 Incomplete installation of light switches on east and west <br /> wall. Dimmer switch will not shut li hts off com letel . <br />3 Data/Phone Light switch does not have a cover plate. <br /> 5152 <br />4 Elect. 5151 Li ht switch does not have a cover late. <br />5 Transit 21 fluorescent lights and two light switches not installed. <br /> Expansion <br /> 5170 <br />6 Con£ 5155 Occu anc sensor not installed. <br />7 Copy 5123 Incomplete installation of under counter fluorescent lights. <br /> 2 <br />8 <br />9 Rece t. 5120 Li ht switch does not control H2luminaires. <br />10 Work/Copy Fluorescent bulb on D4luminaire not working. <br /> 5273 <br />11 Elev. Lobby ~vo (2) Ml luminaires not installed on east wall and one (1) <br /> 5240 M1 luminaire not installed on west wall. <br />12 County Incomplete installation throughout entire room. <br /> Expan. Space <br /> 5225 <br />13 Treasurer Light switch on north wall not installed. <br /> 5223 <br />14 Data/Phone Light switch does not have a cover plate. <br /> 5245 <br />15 Elect. 5246 Li ht switch does not have a cover late. <br />We are proceeding with the project based on the above statements being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation fteports~M+E Punch lists\e091200sitevisit.doc Page 1 of 3 <br />