My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTERFACE ENGINEERING <br />Consulting Enpineers <br />200 Hawthorne Ave, SE #B- <br />210 <br />Salem, OR 97301 <br />503.364.5354 OFFICE <br />Site Visit Report <br />PROJECT: Courthouse Square PROJECT 1996-0570 <br /> NUMBER: <br />SITE VISIT DATE: August 14 <br />2000 SITE VISIT <br /> , NUMBER: <br />AR,CHITECT: Arbuckle Costic Architects <br />R.EVIEWED BY: Ricky Drawhorn <br />PAftTIES PRESENT: <br />^ Mechanical ^ Fire/Life <br />Safety <br />~ Plumbing ^ Electrical ^ <br />Other: <br />ITE <br />ND ROOM NO./ <br />LOCATION <br />REMARKS COMPLETE <br />D <br />1 Breakroom Fix leak in draina e i in under sink. <br />2 2136 Provide e ui ment identification for WH-2. <br />3 Provide 4 KW element at WH-2. <br />4 Womens 2254 Water closet infrared sensors are not operating. Fix <br />roblems. <br />5 Ad'ust faucets to turn off within 2 seconds of hand removal. <br />6 Provide 0.5 GPM aerator at lavato faucets. <br />7 WCO at L-1 not installed. <br />8 Mens 2243 North L-1 o eratin wild. Ad'ust as re uired. <br />9 Water closet/urinal infrared sensors are not operating. Fix <br />roblems. <br />10 WCO at L-1 not installed. <br />11 Provide 0.5 GPM aerator at lavato faucets. <br />12 Missin WCO at water closet wall. <br />13 Janitor 2244 Clean SS-1 to new condition. <br />14 Breakroom Provide 6 KW element at WH-6. <br />15 2295 Provide e ui ment identification for WH-6. <br />16 Janitor 3244 Clean SS-1 to new condition. <br />17 Womens 3254 South L-1 faucet not o eratin . Ad'ust as re uired. <br />18 Water closet infrared sensors are not operating. Fix <br />roblems. <br />19 WCO at L-1 not installed. <br />20 Provide 0.5 GPM aerator at lavato faucets. <br />21 Mens 3243 South L-lfaucet not o eratin . Ad'ust as re uired. <br />22 Water closet/urinal infrared sensors are not operating. Fix <br />roblems. <br />23 WCO at L-1 not installed. <br />We are proceeding with the project based on the above statements being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation Reports~lVI+E Punch lists\p081400sitel.doc Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.