My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTERFACE ENGINEERING <br />Consulting Enpineers <br />200 Hawthorne Ave, SE #B- <br />210 <br />Salem, OR 97301 <br />503.364.5354 OFFICE <br />503.364.5434 FAX <br />Site Visit Report <br />PROJECT: <br />SITE VISIT DATE: <br />ARCHITECT: <br />REVIEWED BY: <br />PAR.TIES PRESENT: <br />Courthouse Square PROJECT <br />NUMBER: <br />7/31/00 SITE VISIT <br />NUMBER: <br />Arbuckle Costic <br />Jeff Karpan <br />1996-0570 <br />Final <br />^ Mechanical ~ Fire/Life ^ Plumbing ~ Electrical ~ Telecommunicati <br />Safety Other: ons <br />ITE ROOM NO./ <br />REMARKS C-011~IaE~FE <br />N~ LOCATION D <br />1 General In large rooms and open spaces switches aren't wired to the <br /> corres ondin li hts as shown in the lans. <br />2 General Power oles aren't installed as shown in the lans. <br />3 General The installation of all duplex receptacles and telephone/data <br /> combinations that are flush floor mounted is incom lete. <br />4 Building Plans call for a double duplex receptacle mounted in the <br /> Inapection casework while only a duplex receptacle is installed. <br /> Reception <br /> 2171 <br />5 ' Confere~ce Combination telephone/data outlet on the north wall isn't <br /> 2201 resent as shown on the lans. <br />6 Deeds/Maps The installation of the combination telephone/data outlet <br /> 2234 mounted in the casework isn't com lete. <br />7 Office 2193 The plans call for a junction box with a flex connection to be <br /> provided with a blank faceplate for future connection to <br /> system furniture on the outer eastern wall of the off'ice, but <br /> a du lex rece tacle is installed in its lace. <br />8 Off'ice 2193 Television outlet isn't installed on the north wall as shown <br /> in the lans. <br />We are proceeding with the project based on the above statements being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation Reports~lVl+E Punch lists\e073100sitevist.dce Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.