Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEM ROOM NO./ <br /> <br />NO. <br />LOCATION REMARKS COMPLETED <br /> Southwest P125 Grids F& G <br />11. Parlcing Complete the instailation of the interior lighting controlle~ override 10/13/00 <br /> Southwest P125 switch at door to Lobby P240 <br />12. Stora e P151 This area was locked and therefore I was unable to inspect this area. 10/13/00 <br />13. Parking Replace noisy ballast in type A2luminaire by Grid 6 and between <br /> Northwest P195 Grids E& F <br />14. Parking Type X2 exit sign at door to Stair S199 is not installed. Provide 10/13/00 <br /> Northwest P195 luminaire. <br />15. Parking Replace broken cover for receptacle on Grid A and between Grids 4 1U/13J00 <br /> Northwest P195 8~ 5 <br />16. Parlcing Provide label for EF-5 Disconnect switch mounted nea~ door to Air 10/13/00 <br /> Northwest P195 P198 <br />17. Parking Complete the installation of the interior lighting controller override 10/13/00 <br /> Northwest P195 switches at door to Stair S199 <br />18. Air P197 This area was locked and therefore I was unable to inspect this area 10/13f00 <br />19. Air P198 This area was locked and therefore I was unable to inspect this area. <br />20. Water Service This area was locked and therefore I was unable to inspect this area. <br /> P201 <br />21. Air P209 This area was locked and therefore I was unable to ins this area. <br />22. Parking Complete the installation of the interior lighting controller override 10/13/00 <br /> Southeast P225 switch at door to Lobb P240 <br />23 Parking Complete the installation of the interior lighting controller ovemde 10/131D0 ' <br /> Southeast P225 switch at doo~ to East Stair S256 <br />24. Parking Complete the installation of the Type A2 luminaire near Grid 12a and 10/1~ <br /> Southeast P225 between Grids M 8 N <br />25. Parking Replace noisy ballast in type A1 luminaire located northwest of the 10/13100 ; <br /> Southeast P225 intersection af Grids 11 & M. <br />26 Parking Replace lamp in type A2 luminaire located on Grid H and between 1~ <br /> Southeast P225 Grids 10 8 10a <br />27. Parking Replace lamp in type A1 luminaire located on Grid 9 and between 10/1~/00 <br /> Southeast P225 Grids J& K <br />28. Parking Replace noisy ballast in type A2 luminaire located north of Grid 5 and <br /> Northeast P225 between Grids H& J. <br />29. Paricing Replace noisy ballast in type A2 luminaire located south of Grid 6 and 10/13/00 <br /> Northeast P225 between Grids G 8 H. <br />30. Pa~lcing Replace noisy ballast in type A2 luminaire located north of Grid 3a 10h3/00 <br /> Northeast P225 and between Grids L 8 M. <br />31. Parking Complete the installation of the interior lighting controller override 10/13/00 <br /> Northeast P225 switches at door to Stair S299 <br />32. Lobb P240 This area was locked and therefore I was unable to inspect this area. 10%1 <br />33. Electrical Provide typewritten panel schedules. Clean interio~ of panelboards. <br /> Switchgear (typical all panelboards on all floors) <br /> P246 <br />34. Air P298 This area was locked and therefore I was unable to ins this area. 10/1 <br />35. Stair S299 The type 61 luminaires are filled with water. Remove water and 10/1~00 ; <br /> verify that sketing has been ins <br /> <br /> GROUND FLOOR ELECTRICAL SUBSTANTIAL COMPLETION = <br /> PUNCLIST <br />1. West Stair S141 Rece tacle has not been instatled. Provide Receptade. ;;~ <br />~ <br />2. Retail 1121 Replace damaged exit sign above door to Main Lobb 1200. ~- -- ~l~:; '~~ ~'~ <br />We are proceeding with the project based on the above statements bei.ng correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additions to this document. <br />M:\9828\Clerical\Observation Reports~M+E Punch liats~Elect Site Visit Reports.doc Page 2 of 8 <br />