My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, ! <br />' COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />~ FlELD OBSERVATION REPORT NO. 30R ( I) <br />Revised September I5. 2000 <br />Page 3 of 4 <br />~ <br />I ' <br />~ <br />I ~ <br />, <br />1 <br />15. Janitors Closet 2244: <br />a. General Gean up needs to be completed. <br />b. Sealant around janitors sink needs to be completed. <br />c. Final coat of finish required on the doors. <br />d. Ciean paint off of door. <br />16. Women's Restroom 2254: <br />a. Trim around stainless steel fixtures above the tile line. <br />b. Gouge in the ceiling directly above the north lav needs painted over. <br />17. Men's Restroom 2243: <br />a. Final coat of finish required on the door. <br />b. Ceiling adjacent to speaker needs the paint touched-up. <br />c. Paint wall access panei. <br />18. Elevator Lobby 2240: <br />a. At both total door packages, termination of the ceramic tile on the wall adjacent to the vinyl, the vertical <br />oak trim should be trimmed down so the edge of the oak lines up with the edge of the tile. <br />b. Floor needs to be buffed and final coat of sealer. <br />c. Elevator face plates, call buttons, direction indicators all need to be fine tuned and properiy set. <br />d. Clean elevator doors and remove plastic. <br />e. Remove paint from door indicators and call button cavers. <br />f. 2 x 2 ceiling tile direction should be uniform for all ceiling tile. <br />g. ~ Above Southwest elevator door the ceiling texture seems to have been rubbed off before final pain6ng. <br />h. Door 2240B, same notes apply with respect to termination of chair rail and the joint between the vinyl and <br />door frame. <br />i. Door 2240A does not have electromagnetic hold opens operational as yet. <br />19. Comdor 2150: <br />, 20. <br />~ <br />~ <br />~ <br />a. Floor needs to be buffed and sealed. <br />b. Adjust hardware at Door 2165A. <br />c. ~nyl covering above chair rail at Door 2240B has been stained, needs to be cleaned or replaced. <br />d. Remove glue from stair side of doors. <br />Data/Com Closet 2152: <br />a. Missing vinyl floor tile. <br />L_ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.