My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. , <br />, <br />' • <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Sa-eet <br />Salem, Oregon 97301-3533 <br />, (503) 581-4 I I 4, Fax (503) 581-3655. E-mail: arcn ~«~+ <br />~ <br />I ~ <br />~~ <br />~ <br />~ <br />~ <br />FIELD OBSERVATION REPORT <br />PROJECT: Courthouse Square JOB NO. 9828 <br />DATE: August 22~ 2000 REPORT NO. 31 R(1) <br />Revised September 14, 2000 <br />PRESENT AT SITE: Leonard Lodder, AIA, Marci Ayers,IIDA <br />This is a Punch List for the Fourth Floor Tenant Areas. <br />1. General: <br />a. At perimeter of window frames, cut paint to a clean, straight line, over sealant joint. <br />b. Final cleaning required following completion of sub-trade work. <br />c. Install ail signage per contract. <br />2. Office 4193: <br />a. Sand edge of door. <br />3. Office 4195: <br />a. Damaged veneer on door, unacceptable. <br />4. Office 4196: <br />a. Remove marks from door frame. <br />5. Space 4176: <br />a. ~ General clean up required at bay window frames and on carpet. <br />b. Touch up paint a adjacent to window frames. <br />6. General Office Area 4175: <br />a. Touch-up paint at east wall. <br />b. Remove gypsum mud from tee bar: <br />c. Remove overspray from ceiling grid at north wall. <br />7. Work Room 4174: <br />a. General cleaning. <br />8. Storage Room 4167: <br />a. Clean wall angle to remove paint. <br />9. Hallway 4156: <br />a. Touch-up base of hoilow metal frame with paint. <br />10. Library Storage Room 4155: <br />a. Touch-up hollow metal frames where they have been scuffed up by carpet installation. <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.