My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ ~~ <br />COURTHOUSE SQUARE <br />PROJECT NO. 9828 <br />~ FIELD OBSERVATION REPORT NO. 37 <br />September 20, 2000 <br />Page 4 of 5 <br />, 20. Computer Work Room 5277: <br />I ~ <br />u <br />I ~ <br />21. <br />t <br />I ~ <br />~ <br />I ~ <br />a. Remove marker lines from casework. <br />b. Finish rubber base wo~ic around casework. <br />c. Missing screw covers in open shelving units. <br />d. Valance cover required. <br />e. Missing file door hardware. <br />f. Final cleaning of the floor required. <br />g. Remove tape from ceiling grid above casework. <br />h. At Door 5276A, chedc keying from both sides, as this is a communicating lock and it should be keyed <br />alike on both sides. <br />Accounting office 5276: <br />a. Door S256H requires painting. <br />b. Proper sigange still required at this door. <br />c. Remove excess gypsum mud to the right of Door S256H and patch paint. <br />d. Touch up Door Frame of S256H. <br />e. Reset ceiling tile that is missing. <br />f. Cleanup nibber base. <br />22. Office 5296: <br />a. Touch up door frame and clean. <br />23. Open Office Area 5274: <br />' a. Remove tape from ceiling grid. <br />b. Touch up of texture required adjacent to Door 5295A and paint. <br />I ~ <br />a. Touch up bottom one foot of door frame. <br />b. Remove tape from ceiling grid. <br />' 25. Office 5294: <br />I ~ <br />I ' <br />I ~ <br />' <br />~ <br />24. Office 5295: <br />a. Touch up door frame damaged by carpet. <br />b. Remove overspray and tape from wall angle at north wall. <br />c. Remove tape from ceiling grid along ail four sides. <br />26. Work Copy Area 5273: <br />a. Rubber base required around the casework. <br />b. Reset ceiling tile in southeast comer, it appears that the last ceiling tile against the south wall may be too <br />small. <br />c. Reset wall angle on south wall as well to ensure proper contact between the ceiling tile and the wall angle <br />and the grid. <br />d. Touch up required to paint above casework upper cabinets, prope~ly spackie all nail holes. <br />e. Damaged ceiling tile above casework upper cabinets. <br />27. Reception Area 5271: <br />a. Damaged ceiling tile in northeast comer. <br />b. Finai cleaning required in all areas especially around wall boxes which have gypsum dust. <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.