My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Certificate of Substantial Completion
>
CS_Courthouse Square
>
Certificate of Substantial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:03:30 PM
Creation date
8/3/2011 4:57:00 PM
Metadata
Fields
Template:
Building
RecordID
10403
Title
Certificate of Substantial Completion
Company
Arbuckle Costic Architects, Inc.
BLDG Date
2/17/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ • . - f '.--. <br />~COURTHOUSE SQUARE f <br />PROJECT NO. 9828 <br />~ FIELD OBSERVATION REPORT NO. 37 <br />September 20, 2000 <br />Page5of5 <br />, c. Remove tape or something else from ceiling tile in northwest comer. <br />d. Provide sealant bead and cut in paint to bottom of reception counter on this side. <br />~ e. Finish wood bullnose at reception counter. <br />28. Conference Room 5252: <br />~ a. Door 5252A needs to be replaced. <br />b. Missing switch and wall plate, etc. adjacent to Door 52526. <br />c. Missing part of the floor plate cover, data cover in middle of room. <br />~ d. Remove paint from wall on north wail behind column cover. <br />29. Waiting Room 5251: <br />~ a. Reception counter between waiting and reception space requires finish to bulinose and requires support <br />undemeath the extended edge. <br />b. Remove glue above chair rail immediately to the left of the reception opening. <br />~ c. Fill nail holes that have been left open in the chair well. <br />d. Final cleaning still required as far as vacuuming is concemed especially in the comers. <br />e. Door 5251A final coat of finish still required. <br />f. Clean up door frame and touch up. <br />' g. Adjust carpet base immediately to the right of the entry door. <br />h. Check with Interface regarding lighting at Door 5251A as this is a relatively dark comer. <br />i. Chair rail finish incomplete at either side of the reception opening. <br />~ <br />, <br />~ <br />i <br />~ <br />cc: Billy Wasson, Marion County <br />' John Whittington. S.A.M.T.D. ~/ <br />Craig Lewis, Melvin Martc Development Corp. <br />Bob McCune, Marion County <br />~ Century West Engineering ___- - <br />Interface Engineering nar~ic. Lodder, AIA <br />Westech Engineering <br />Pence/Kelly Construction <br />, File <br />File: 982&9A <br />, This confirms and records our interpretation of the discussions which occuRed and our understanding reached during this meeting. <br />Please notify in wri~ng within seven days of the date indicated above if the interpretation or description is inc~ompiete or inaccurate. <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.