Laserfiche WebLink
~ ,_~ <br />~ <br />ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 Sate Street FIELD OBSERVATION REPORT <br />Salem, Oregon 97301-3533 <br />(503) 581-4114, Fax (503) 581-3655. E-mail: architectsQarbuck~ecosac.com <br />' PROJECT: Courthouse Square JOB NO. 9828 <br />~ DATE: September 25, 2000 REPORT NO. 38 <br />PRESENT AT SITE: Leonard Lodder, AIA and Marci Ayers, IIDA <br />~ The foliowing is a Punch List for the Fifth Fioor Core Areas: <br />1. General: <br />~ a. Fnai cieaning required following completion of sub-trade work. <br />b. Instatl all signage per contract. <br />, 2. Comdor 5241: <br />a. Door 5237A has been scratched which has affected the finish on the room side of the door. <br />~ b. Wall plate cover at the east end of the corridor does not match all the plate covers eisewhere in the <br />corridor. <br />c. Door S256G. the center mullion requires paint finish. <br />d. Clean scuff marks from vinyl wall covering and repair damage to vinyl wali covering on south wall <br />, adjacent to Door 5235A. <br />e. General cieanup yet required on the wall surfaces. <br />f. Vinyl wail covering on the South wail both sides of Door 5225A has been badly damaged needs to be <br />1 replaced. (Note: this may be a move-in issue). <br />g. Soffit at Door 5240A has not been painted. <br />3. Electrical Closet 5246: <br />t a. Requires floor finish. <br />b. ~ Door has scratch marks adjacent to handle or something that needs to be cleaned off and refinished. <br />~ c. Primer coat required to walls in this room. <br />4. Data/Com Room 5245: <br />' a. Floor finish required. <br />b. None of the walis have received any finish in here. <br />~ <br />' <br />5. Janitors Closet 5244: <br />a. General cleanup required all around in here. <br />b. Missing rubber Base. <br />c. Paint concrete wall. <br />6. Women's Restrooms 5254: <br />~ <br />, <br />~ <br />a. Door 5254A has urethane n.ms near the top right hand comer. <br />b. Note that trash bags in the waste receptacle are collecting air from the partitioning system. <br />c. Clean pencil marks off the plastic laminate partitioning system. <br />d. Patch paint areas in the ceiling that appear to be blistered. <br />e. Remove glue from seams in vinyl wall covering in southeast comer. <br />~ <br />