Laserfiche WebLink
ent by: STATON CONSTRUCTION <br />. ~ <br /> <br />1 541 461 0545; 05r 12 `97 8:28A~~•:1;~ #50; P~aC~e ?!2 <br />STAT~N CQNSTRUCTIC3N, INC. <br />2:3:~91-L~ AIR1-~i)Rl HD. <br />(541) 4Ci1-U54'.: <br />DAT~: May 12. 1997 <br />TO: D~vid Hartwig <br />Marion County <br />FROM: Ron Richey <br />SUBJECT: Courthouse Square <br />Demolition <br />E~frEN~ ~~R 974a2-959~ <br />FAX 461-CIS+i~ <br />Writ'Cen responses and clarifications as per our 5/719'7 pre-con; <br />Beri Building; The signature wall will need to be s~lvaged by a competent <br />b~ick or blo~k mason. We can arrange far this or you can. Specific <br />ertgineered demolitian techniques will be required to achieve salvage. Please <br />advise if you desire ta have Staton include in our scope of work and we will <br />provide cost estimates. <br />Start Date; Staton will provide dates via facsimil~ upon notice ta praceed <br />from Marion County. <br />SalvagelRecycling re~enue split; C~nditiorts for salvage/recycling negotiations <br />in the 5(5/97 Staton letter to Marion County are revised as fallows: <br />1.) Additional salvagelrecyding revenues generated on this projeCt grea[er <br />than 540,~00.00 shall be split on a 5Ql5Q basis b~tween Staton and h/larion <br />County. The split will occur after Statan mareagement, removal and <br />transportation costs have been deducted from revenue, and after <br />transportation and disposal fee`s inciuded in the original proposal have been <br />accounted f~r and added to the revenue. Staton c4sts to be calculated from <br />Statnn's 1 997 Rental Rate Sheet. Disposal costs to be calculated from Coffin <br />BuY~e Landfill ar Woad Waste Reclamatifln. <br />2. ) FLIMINA T~Q <br />3.) UJUCHANGE~ <br />4 . ) UNCHANGED <br />~EO ! ICENSE a!2~U' & t2<;,8 UH ~'~e n u~~?i EFA~GEQ IDa ORD980981:37 <br />