Laserfiche WebLink
CH2 Project Meeting <br />March 15, 2001 <br />Attendance: <br />John Gremmels <br />Leonard Lodder <br />Certificate of Occupancy. <br />Will have to play hardball. UL Listed. They think they have a case. <br />Will call Brainard and the makers of the fan. Need to convince B. Whiteside. <br />Testing & Balancing. This was turned over to Bob McCune. Will check in with him at the next <br />meeting to check on status. <br />Northwest Industrial (painter) went out of business. They were pretty much done except for some <br />over spray. This has delayed some of the cleanup. Will cost us about $500 to finish up the job. <br />Warranty Issues: <br />Leak. There is a leak on the 3rd floor (3201). We need to find out where it is coming from. <br />Faucets. Should be done next week. John will call Dick and let them know that we are arixious to <br />get these fixed. <br />Transit. Automatic big doors on the ground floor. Will need to investigate, but they are saying <br />that the doors are being abused by people coming in and out. <br />Medallions. These will be completed as weather permits. <br />Punch List: <br />Indoor punch list is completed. There is only exterior stuff left to do. Should be finished in a <br />week or so. Will do final sealing and calking when weather permits on driveways. <br />Misc. <br />Cascade Sound is working on finishing up in the hearing room. <br />The Transit folks are not happy with the resolution on the surveillance cameras. Said they can't <br />see faces. John will follow up on this. He said the system they purchased was not at the higher <br />end of the scale. (They probably got what they paid for) <br />Had a little bit of quake damage on the 5"' floor. Some of the partitions bounced out of their <br />tracks on the transit side. Will have to look into this. <br />