My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />E. RECOMMENDATION <br />1. Planning should begin immediately for the eupansion of the jail and its bed <br />capacity. <br />2. Relocation of the conections administration should also be considered in order <br />to add more bed space to the Work Release Center. <br />3. At least one jail pod (150) beds, should be added in Phase I. <br />4. If state policies increase the impact on jail population, planning should include <br />a second pod as soon as possible. <br />5. This planning should attempt to meet the county's needs for the next 10 years. <br />6. For the period beyond 10 years, the county should consider other options <br />including a forest camp, double bunldng or full occupancy of the pods. <br />PAGE 3 <br />ksj/cd/Corrections. 03/10/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.