My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Steering Committee(Folders 1-2)
>
CS_Courthouse Square
>
Meetings Steering Committee(Folders 1-2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:37:49 AM
Creation date
8/5/2011 3:34:36 PM
Metadata
Fields
Template:
Building
RecordID
10093
Title
Meetings Steering Committee(Folders 1-2)
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
615
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction of up to approximately 29,000 square feet of space at the health building. <br />These recommendations should accommodate Health Department space needs for the next <br />20 years. <br />C. COST FACTORS <br />1. The total cost of the project is estimated at $6 million provided that the entire <br />29,000 square feet referred to above is constructed. Cost estimates include the remodel of <br />the existing juvenile and health building plus new construcrion. <br />Z. New construction costs may be reduced, however, if additional space needs do <br />not grow as anticipated or if future operating revenues are not available. <br />3. The committee noted that the cost of this project in relation to the benefits <br />received bv the lar~e population served, makes this project one of the best values of all <br />facility projects. <br />D. OPTIONS CONSIDERED <br />1. The committee considered the possibility that occupancy of the juvenile <br />building may not be permanent. This decision may affect the size of the new construction <br />at the health building. <br />E. RISKS AND LIABIL~'I'IES <br />1. Operating revenues may not be sufficient to support the new building space. <br />The county may need to consider the use of addirional ta}c base revenues to support <br />operational costs. <br />2. Increased traffic on Center Street and the adjacent neighborhoods must be <br />addressed by widening Center Street and construcrion of a new driveway south to State <br />Street. <br />PAGE 12 <br />ksj/cd/Facilities.Int 03/18/'95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.