Laserfiche WebLink
Marion County Facilities Master Plan <br />Overcrowding at the Health department is the only rearon for a space shortfall -- no significant <br />"new" spaces are required, yet the existing offices and clinics are substantially impacted by lack <br />of space. Two divisions, Mental Health (Children and Adolescent prognms) and MR/DD, have <br />been relocated to leased space at additional operational expense. Three functions presently <br />located at this site (Dog Control, Elections and OSU Extension) have no functional adjacency <br />requirement with Health and should be relocated to aliow for reconsolidation and expansion of <br />the Health department. Whether or not the County elects to develop a Kennel to be operated <br />by Dog Control, the Counry should relocate this function to an independent site or adjacent to <br />the SherifPs patrol functions. <br />Elections should also be relocated, but within the pazameters of certain facility planning criteria. <br />The County Clerk Elections Division must be located adjacent to a multi-purpose room(s) which <br />can serve as ballot processing rooms during times of election (about 5 times per year for 10 days <br />each). Because'of the specific process requirements of the Election Division, the adjacency of <br />their space to the multipurpose space is critical and a location at or convenient to a loading <br />dock/freight elevator is essential. <br />The County could relocate the OSU Extension to a separate site given its lack of adjacency needs <br />with other County functions. OSU Extension would best be conveniently accessible from <br />Interstate 5, generally east of Salem for greatest convenience to their clients. <br />In addition to requirements of the Health Department, the 7uvenile and Family Court Center will <br />require additional space and site resources. As mentioned previously in Section 5.0, the Juvenile <br />and Family Court Center is expected to grow from a total of 38,311 gross squaze feet curzendy <br />to 44,321 GSF by 1995 in an expansion currenUy in the planning stages. Beyond that, the JFC <br />center will increase to an estimated 62,324 GSF by 2000 and to 74,922 GSF by 2012 on the <br />vacant portions of the site directfy north and south of the existing facility. The projected growth <br />of the Health and Juvenile facilities can easily be accommodated on the Center Street site; <br />however, it is recommended that a comprehensive site plan be conducted prior to actual <br />development of any building expansion. <br />The 48,170 NSF current space shortfall increases as the County staff grows over time -- to a <br />total of 146,824 NSF between the 2013 (Projection A) requirements and the existing occupied <br />space. This 2013 shortfall may be a little as 118,720 NSF following Projection B or as high as <br />183,213 NSF given the maximum growth scenario of Projection D. Projection A is the <br />recommended facility planning projection given current conditions. <br />Page 20 <br />