Laserfiche WebLink
<br />4. Further study is needed to determine actual feasibility for this project. <br />D. OPTIONS CONSIDERED <br />1. There were two options considered for accommodating the Public Works staff. <br />2. One option was to maintain full staffing for Administration, Engineering and <br />Survey downtown. This was considered the least efficient use of Public Works funds. <br />3. The savings and productivity jains were best realized with the second option <br />of moving to our Roads facility. The second option also provided greater customer service <br />to our customer base. <br />E. RISKS AND LIABILITIES <br />1. A conditional use permit is apparently required for a new building at the <br />Silverton Road facility and there is no guarantee that it will be granted. <br />2. The septic and water needs also have to be addressed. <br />. <br />3. The current facility's electrical needs are already under powered and a study <br />is underway to determine the extent of the required upgrades. T'his issue should also be <br />studied with a new facility in mind. <br />PAGE 27 <br />4ci/rr~/G'orilitiPC Tnt (1~/1Rl95 <br />