Laserfiche WebLink
Downtown Campus <br />~itable Center <br />r ~ <br />~ ~ <br />L J <br />Relp~ate\ <br />Off~~S ounry <br />Sheriff <br />Sell Franklin <br />Consolidate County Offices into one facility and <br />remodel the Courthouse to upgrade security and add <br />new courtrooms, <br />0 tion 1: Evaluate the Equitable Center for <br />future use as a Public Service Building, <br />Cost: $9,6 -11.6 million. <br />0 tp ion 2; -f option 1 is not feasible, construct a <br />new Public Service Building on the Senator <br />Block. Cost: $19.6 million. <br />Juv.IHealth Campus <br />I ~Qei <br />rh <br />~ t ' exp <br />~ <br />/ C i <br />\_/ i <br />Juvenile ~ _ ~ <br />~nCi <br />Construct a new 96 bed Juvenile facility <br />on 6 acres west of the present facility, <br />Add 32 bed pod when needed. Cost: $18 million, <br />Phase I, remodel the vacated Juvenile office <br />and Health building. Relocate space leased <br />by Health to this campus. Cost: $2 million. <br />Phase Il, construct addition to the Health <br />Building. Cost: $4 million. <br />0o Corrections/Tri-Agency <br />~~a, pa~o, Campus <br />\~~ e,,o <br />~~ ~0b <br />Jail <br />. <br />~ <br />~~ <br />~~ <br />~ She~ <br />~ <br />Salem P.D• <br />S~te police <br />Construct a 165,000 sq. ft. Joint law enforcement facility. <br />The Sheriff and Corrections will vacate the Work Release Ctr. <br />making room for 20 additional beds. Parole and Probation <br />will relocate to the Jul campus. Cost: $30 million. <br />