Laserfiche WebLink
3. The relatively small size of this project makes it possible to acquire funding from <br />contingency or other facility revenues. <br />D. OPTIONS CONSIDERED <br />1. The cost of this project would be reduced if the facility was located on property <br />currently owned by the county. Space may be available at the health campus in space vacated <br />by the juvenile department or in the 3060 building vacated by the pazole and probation staff. <br />2. Discussion also considered the possibility of a joint facility combined with the <br />Humane Society. However, given the differing missions, funding sources and operational <br />practices of these two entities, the development of a common facility does not appear to be <br />practical at the present time. <br />3. If the county determines that it is desirable to build a kennel in the future, <br />additional land can be purchased at that time. <br />E. RISKS AND LIABILITIES <br />1. The department has included information that indicates that annual funding for <br />operations is in jeopardy. The department needs a stable source of funding before new long term <br />facilities are constructed. <br />2. More research is also required on an environmentally safe way to wash and sanitize <br />the trucks. It appears that it will be possible to use the facilities at the Humane Society. <br />PAGE 30 <br />ksj/cd/Facilities.Int 04/07/95 <br />