My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings EMT Workshop
>
CS_Courthouse Square
>
Meetings EMT Workshop
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:38:48 AM
Creation date
8/5/2011 3:46:13 PM
Metadata
Fields
Template:
Building
RecordID
10097
Title
Meetings EMT Workshop
Company
Marion County
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D~ ~ <br />EMT WORKSHOP <br />MARCH 10, 1998 <br />PRESENT: John Burt, Randy Curtis, Bob McCune, Jeff Davis, Doug <br />Ebner, Carol Fischer, Roy Flint, Randy Franke, Bob Hansen, Mike Hansen, Gloria <br />Roy, Don Wyant, Craig Luedeman, Jerry Frost, Larry Oglesby, Greg Olson, Mary <br />Pearmine, Dale Penn, Ken Roudybush, Billy Wasson, Judy Robbins. <br />PURPOSE: Acquaint everyone with policy issues and related impacts <br />around Courthouse Square. <br />FACILITATOR: Billy <br />CLERICAL NOTE: A packet was sent to each participant prior to this <br />meeting and general notes will relate to pages or comments about this document. <br />Additional handouts at the meeting are attached to these minutes and sent by hard <br />copy to those members not in attendance. Those in attendance will receive these <br />minutes by e-mail only, assuming you received all additional handouts at the <br />meeting. If you do not have a referenced handout and wish to have a copy, <br />contact Laverne. <br />HISTORY: <br />(The Transit history in the project has been left out.) <br />The county started in 1974 to purchase the entire "Senator Block" with the-plan to <br />develop it for future county needs. The general "idea" was not just created as <br />indicated by the newspaper. Randy C. indicated that the idea of a joint transit mall <br />and county facility has been in the works since about 1985, unlike what has been <br />written in the newspapers. <br />Dan Berrey and Associates was selected through an RFP process in June 1996. <br />Cost analysis was developed and found that the budget was out of balance about <br />$3 million, and through more analysis it was found that there were flaws and <br />hidden project costs, which made it clear that it was becoming more and more out <br />of budget. The original plan was to have a retail level on the first floor and <br />funding from Mr. Berrey (private developer) for that area was supposed to become <br />a$2 million portion into the "poY'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.