Laserfiche WebLink
ARBUCKLE COSTIC ARCHITECTS, INC. <br />363 State Street <br />Salem, Oregon 97301-3533 <br />(503) 58 I-4 I I 4, Fax (503) 58 I-3655, E-m311: architects@arbucklecostic.com <br />FIELD OBSERVATION REPORT <br />PROJECT: Courthouse Square <br />DATE: October 9, 2000 <br />Revised January 10, 2001 <br />PRESENT AT SITE: Leonard Lodder, AIA <br />The following is a punch list for the elevators and building stairs: <br />1. General: <br />a. Final cleaning required following completion of sub-trade work. <br />b. Install all signage per contract. <br />2. Elevator No.1: <br />Grout missing at perimeter of floor. <br />3. Elevator No. 2: <br />a. Grout missing at perimeter of floor. <br />b. Lower panel, north side, east end, misaligned with upper panel. <br />4. Elevator No. 3: <br />a. Grout missing at perimeter of floor. <br />Stairwell S256. <br />JOB NO. 9828 <br />REPORT NO. 42R (1) <br />a. Between second floor and ground floor there is a lot of dust adhered to the south wall. This needs to be <br />removed before the final coat of paint is applied to the stairwell. This also occurs on the north wall near <br />the ground floor. ~ <br />b. Remove paint overspray at grille. <br />Stare S141: <br />Standpipe leak at ground floor level at second floor. <br />Fourth floor landing is very uneven. <br />Fifth floor landing is uneven and pops. -'~~! +~~--`' ~~~'t t~Y~i°~"" <br />cc: Billy Wasson, Marion County <br />John Whittington, S.A.M.T.D. <br />Craig Lewis, Melvin Mark Development Corp. <br />Bob McCune, Marion County <br />Century West Engineering <br />Interface Engineering <br />Westech Engineering <br />Pence/Kelly Construction <br />File <br />By: Leonard Lodder, AIA <br />File: 9828-9A <br />This confirms and records our interpretation of the discussions which occurred and our understanding reached during this meeting. <br />Please notify in writing within seven days of the date indicated above if the interpretation or description is incomplete or inaccurate. <br />