Laserfiche WebLink
. - ----- - -_ _ _ ----- -- _ _ . . _ _- - -- -- -- ----- - - _. _ . __ -- --- - ------ -- -- _ --- - - - <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-Deo-9 <br />Court & High Street James A. Jercie, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Deo-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50% Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />- - - - - ------- ----- ----- _ _ - ---- - -- _ --- -- --- -- --- _ <br />-- - ------ -- -- -- <br />Fourth Floor 2g,pg2 <br />Total Area 28,062 sf <br />- --- ----- --- __ - - - -- - -- <br />----- -- - - - <br />Fourth Floor Tenant Finishes Quantit~_ _Unit Cost/Unit _ Cost Total ~ s a= , ~„ .:: i~; Comments <br />- -- -- - - -- <br />-- --- <br />--- _ ~ <br />FINISHES <br />-- ---- -- --__ __-- -- <br />- - - -----T------ -- <br />Pa~titions <br />typical partitions <br />full ht partition <br />plumbing chase partition <br />furr columns <br />acoustic @ above <br />furring @ concrete wall <br />suspended gypboard ceiling systems <br />toilet room <br />Subtotal <br />Ceilings <br />install ceiting grid 8~ tiles <br />Subtotal <br />Ceramic Tile <br />floor tile <br />type E <br />base <br />type F <br />wall tile <br />type F <br />Subtotal <br />Resilient <br />vct <br />rubber base <br />Subtotal <br />10,035 sf 3.45 34,621 34,621 0 <br />758 sf 4.30 3,261 3,261 0 <br />135 sf 7.00 945 945 0 <br />2,556 sf 3.50 8,946 8,946 0 <br />5,018 sf 0.65 3,261 3,261 0 verify <br />756 sf 2.25 1,701 1,701 0 <br />350 sf 3.75 1,313 1,313 0 <br /> 54,047 54,047 0 <br />25,827 sf 0.58 14,980 14,980 0 <br /> 14,980 14,980 0 <br />350 sf 9.00 3,150 3,150 0 <br />156 If 10.00 1,560 1,560 0 <br />448 sf 8.50 3,808 3,808 0 <br /> 8,518 8,518 0 <br />1,693 sf 1.75 2,963 2,963 0 <br />3,799 If 1.50 5,699 5,699 0 <br /> 8,661 8,661 0 <br />Fourth Floor Tenant Improvements Detail Estimate - Page 4 <br />