|
-- - _ __ _ _ _ _ _ __ _ __ - - ----------~--------------------
<br />Courthouse Square Architectural Cost Consultants, LLC
<br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221
<br />50% Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187
<br />Fifth Floor
<br />Transit
<br />Transit Expansion
<br />Counly Expansion
<br />Solid Waste
<br />Tota~ Area
<br />---- __ ----- ___ __ _ _ __.
<br />Fifth Floor Tenant Finishes
<br />--- ---- - --- - _ _
<br />-
<br />FURNISHINGS
<br />' wndow treatment
<br />~ relites & sidelites
<br />transit
<br />solid waste
<br />Subtotal
<br />Fumiture, desks, seating, file cabinets, etc
<br />fumishings
<br />Subtotal
<br />TOTAL - FURNISHINGS
<br />343 sf 5.00
<br />76 sf 5.00
<br />0 sf 0.00
<br />1,715
<br />380
<br />0
<br />0 1,715 0
<br />0 0 380
<br />2,095 0 1,715 380
<br />_ NIC - By Tenant
<br />0 ~~0 ~ 0 0
<br />5 $0 $1,715 $380 0.07
<br />SPECIAL CONSTRUCTION --- -
<br />Item sf 0.00 0
<br />Subtotal 0 0 0 0
<br />_ __ _TOTAL_ SPECIAL CONSTRUCTION _ _ a0 $U $0 $0 0.00
<br />H
<br />~
<br />PI
<br />~
<br />i
<br />I
<br />1
<br />c
<br />ECNANICAL -
<br />/AC
<br />ransit 10,958 sf 3.56 39,000 0 39,000 0
<br />~olid waste 5,866 sf 3.24 19,000 0 0 19,000
<br />~unty 8,962 sf 0.00 0 0 0 0
<br />Subtotal 58,000 0 39,000 19,000 2.07
<br />umbing
<br />raterclosets 3 fixt. 2,200.00 6,600 6,600
<br />irinal 1 fixt. 2,200.00 2,200 2,200
<br />av sink 4 fixt. 2,000.00 8,000 8,000
<br />itchen sink 2 fixt. 2,000.00 4,000 4,000
<br />ishwasher hookup 2 fixt. 500.00 1,000 1,000
<br />Subtotal 21,800 0 21,800 0 0.78
<br />.
<br />10,958
<br />2,240
<br />8,962
<br />5,866
<br />---- - 28,026
<br />Quantity __Unit Cost/Unit Cost Total
<br />Estimate Date: R 03-Dec-9
<br />Document Date: 29-Oct-98
<br />Print Date: 03-Deo-98
<br />Print Time: 11:07 AM
<br />_ _ Construction Start: Spring 99
<br />sf
<br />~ e Comments
<br />Fifth Floor Tenant Improvements Detail Estimate - Page 8
<br />
|