Laserfiche WebLink
----- - __ _ _ _--- _ ___-- _ _ _ . __ -------------- _ _ _ _--- --- ---- _ __ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R o3-Dec-9 <br />COUrt 8 High St~eet James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Can on Court, Suite 103 <br />Y Print Date: 03-Dea98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50°~ Contract Documents Estimate _ Phone (503) 297-7210 Fax (503)_297-7187 Construction StaR: Spring 99 <br />------- - - --- --- - --- - -- - - <br />(Alternates J Quantity Unit Cost/Unit Cost Total Comments <br />Parking Alternate 1 - Continued <br />MOISTURE - THERMAL CONTROL - Conti ued <br />Flashing & Sheet Metal <br />miscellaneous 1 sum 1,000.00 _ 1,000 0 0 1,000 <br />Subtotat 1,000 0 0 1,000 <br />Caulking & Sealants ' <br />caulking 22,092 sf 0.10 2,209 0 0 2,209 <br />Subtotal 2,209 0 0 2,209 <br />__ TOTAL - _MOtSTURE - THERMAL CONTROL $81,626 ~0 SO ~81,626 3.69 <br />_ _FINISHES <br />P <br />int & walicoverings <br />>avement markings <br />parking stall striping 72 ea 3.00 216 0 0 216 <br />ADA logos 0 ea 35.00 0 0 0 0 <br />diagonal striping 0 sf 1.25 0 0 0 0 <br />;ealed conc. floor <br />stairs 888 sf 0.75 666 0 0 666 <br />~aint / finish door 8~ frames 2 ea 50.00 100 0 0 100 <br />~aint cmu & concrete walls 0 sf 0.55 0 Q 0 0 foundation wali NIC <br />~aint exposed ceiling sf 0.00 0 0 0 0 NIC <br />~iscellaneous specialty painting 1 sum 1,000.00 __ _1,000 0 0 1,000 <br />Subtotal <br />-- - __- -- - 1,982 <br />-- - - _--- -- 0 0 1,982 <br />TOTAL FINISHES <br />-- - -- -- ---- ------ ____ __ ____ _~1,982 <br />- __ _ _ a0 $0 <br />_ 51,982 a <br />0.09 <br />Alternates - Page 6 F <br />Y <br />