Laserfiche WebLink
- -_ _ _ _ _ ._ _ _ _ _--- --- - - -- - --_ -- ------ <br />~Courthouse Square Architectural Cost Consultants, LLC <br />COUtt 8 High St~eet James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 <br />~Afiuckle Costic Architects, Inc Portland, Oregon 97221 <br />50% Contract Documents Estimate ~ Phone (503) 297-7210 Fax (503) 297-7187 <br />Ground Level 23,249 <br />Second Floor 31,537 <br />Third Floor 32,086 <br />Fourth Floor 32,088 <br />Fifth Floor 32,012 <br />Penthouse 1,818 <br />Total Gross Aroa 152,792 sf <br />-- --- -- <br />Building Shell_& Core - - - - - <br />Quantity_ -- -- <br />Unit -- <br />CosUUnit <br />DOORS, WINDOWS & GLASS - Continue <br />Doors, Frames & Hardware - Continued <br />type A WD 11 ea 775.00 <br />type A WD - 20 min 65 ea 835.00 <br />type A WD - 20 min 2 pair 1,850.00 <br />type B WD - 20 min 1 pair 1,975.00 <br />type F WD - 20 min 2 ea 1,200.00 <br />Subtotal <br />Relites, Sidelites & Transoms <br />main lobby 98 sf 28.50 <br />main lobby @ 2nd floor 88 sf 28.50 <br />second floor elev lobby 105 sf 28.50 <br />@ tenant entries <br />2nd 8 ea 412.00 <br />3rd 6 ea 412.00 <br />4th 5 ea 412.00 <br />5th 5 ea 412.00 <br />Subtotal <br />~ Overhead & Coiling Doors <br />~ <br />8,525 8,525 <br />54,275 54,275 <br />3,700 3,700 <br />1,975 1,975 <br />2,400 2,a00 <br />160,625 0 0 0 0 160,625 <br />Comments <br />2,793 2,7s3 <br />2,508 2,508 verify plan vs sctn & elvtn <br />2,993 2,993 <br />3,296 3,2s6 assume 7'2" x 2'0" <br />2,472 2,a72 assume T2" x 2'0" <br />2,060 2,060 assume T2" x 2'0" <br />2,060 2,06o assume 7'2" x 2'0" <br />18,182 0 0 0 0 18,182 <br />parking entry gate sf 0.00 0 <br />8 x 10 oh insulated 1 ea 1,200.00 1,200 <br />9 x 10 oh insulated 2 ea 1,500.00 3,000 <br />' Subtotal 4,200 <br />Windows <br />curtainwall / storefront 9,089 sf 34.00 309,026 <br />alumn windows 11,754 sf 26.00 305,604 <br />Subtotal 614,630 <br />Cost Total <br />Estimate Date: R 03-Dec-9 <br />Document Date: 29-Oct-98 <br />Print Date: 03-Deo-98 <br />Print Time: 11:07 AM <br />_ Construdion StaR: Spring 99 <br />aoI aol sol so <br />o NIC - w/ parking estimate <br />~,200 <br />3,000 <br />aa,2oo <br />I 305,604 <br />ao so so $o as~a,sso <br />Building Shell & Core Detail Estimate - Page 10 <br />~ <br />