Laserfiche WebLink
_ __ _ <br />-- ---... <br />jCourthouse Square <br />Court 8~ High Street <br />Salem, Oregon <br />Arbuckle Costic A~chitects, inc <br />50% Contract Documents Estimate ____ ____ __. _. _ <br />Parking Level One <br />Gross Area <br />_ -._ _ - -- <br />---- <br />Parking __ Quantit <br />Estimate Date: R 03-Dec-9 <br />Document Date: 29-Oct-98 <br />Print Date: 03-Dec-98 <br />Print Time: 11:07 AM <br />Construction Start: Spring ~ <br />71,979 ---~----- <br />---- 71,979 sf <br />_ ----- -- <br />---- ----- - <br />Cost Total , <_~„ ~ . . . fi~ , :; `,: ", Comments <br />-_ ---- --- _. ---- --- I <br /> <br />3 <br />~~ • <br />370 If $6.00 $2,220 <br />2,220 <br /> 340 If 6.00 2,040 2,040 <br /> 300 If 6.00 1,800 1,800 <br /> 370 If 6.00 2,220 2~22~ <br />l sum 0.00 0 0 NIC - I <br />terial remova $8,280 $0 $0 $8,280 <br />r~1/11 ITIl1A1 yH~ZHO . ~O ~0 ~H~Z~O <br />ty Others (if <br />0.12 <br />-SITE WORK ------ --- ------ -~ <br />Building related earthwork <br />600 <br />sf <br />00 <br />30 <br />000 <br />18 18,000 @ vault area <br />temp. shoring @ perimeter . , <br />parking area <br />mass excavation 71,979 <br />12,821 sf <br />cy <br />5.00 <br />64,105 64,105 <br />bankcut 1,823 cy 5.00 <br />00 <br />7 9,115 <br />4 <br />396 9,115 <br />4,396 <br />w/ on site material <br />fill under slab <br />i 628 <br />039 <br />3 cy <br />cy . <br />7.00 , <br />21,273 21,273 w/ on site material <br />on <br />backfill against foundat , <br />bus mall area @ sog 41,559 sf <br />00 <br />5 <br />530 <br />530 <br />cut 106 <br />1 <br />983 cy <br />cy . <br />7.00 13,881 13,881 w/ on site material <br />fill <br />haul & dispose excess material off site , <br />9,100 cy 6.00 54,600 54,600 <br />000 <br />25 <br />dewatering 1 sum 25,000.00 25,000 <br />0 , <br />0 NIC w/ building <br />elevator pit excavation sum 0.00 <br />structural (foundation) excavation <br />595 <br />1 <br />cy <br />15.00 <br />23,925 23,925 <br />footings <br />interior walls , <br />38 cy 15.00 567 567 <br />structural (foundation) backfill <br />957 <br />cy <br />18.00 <br />17,226 ~~,226 <br />footings <br />interior walls 24 cy 18.00 428 428 <br />912 <br />3 <br />haul 8~ dispose excess material off site 652 cy 6.00 3,912 , <br />7 <br />055 <br />level & grade 70,548 sf 0.10 7,055 , <br />895 <br />11 <br />4" gravel under slab 915 cy 13.00 <br />15 <br />0 11,895 <br />11 <br />640 , <br />11,640 @ strg rm 8~ elevtr Ibby only <br />vaoor barrier 77,603 sf . , , <br />_ __--- ----- __--- - --- - _ <br />-- ---. ----- <br />Architectural Cost Consultants, LLC <br />James A. JeMe, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210_ Fax (503)297-7187 ___ <br />Unit CosUUnit <br />Parking Detail Estimate - Page 1 <br />