Laserfiche WebLink
--- --- - - <br />_ --- - _ _ _ --- ------ - - --- -- - ~ <br />_ _ _--_ __ <br />~Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-Dec-9 <br />Court & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 I <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 I <br />Arbuckle Costic Architects, inc Portland, Oregon 97221 Print Time: 11:07 AM <br />SO~o Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187 __ ____ __ _ Construction Start: Spring 99 <br />_------- - - _ ._---- <br />__ ..__ __. _---- -- - <br />_ _ . _ . _ <br />Parking Level One _ - 71,979---- - _-_--__-- <br />Gross Area 71,979 sf <br />_ --- ---- _ - - -- -- -- - --- - _- ~ - - _ - <br />____ _ _- -- <br />- -- - - - - omments <br />Parking --- - --- --- - - - -- Quant~ Unit CosWnit Cost Total ~E ,. ; ~k . °. ~. <br />----- --- ------- <br />__ _ _ <br />-- - --_ __ _ 1 <br />CONCRETE - Continued <br />reinforcing steel <br />spread footings <br />continuous footing <br />slab on grade <br />4" <br />6" <br />columns <br />wails <br />basement <br />interior walls <br />beams <br />post tension <br />r/s <br />supported slab <br />post tension (unbonded) <br />r/s <br />parking ramp <br />post tension (unbonded) <br />Ns <br />mesh ~ concrete topping slab <br />3" 3000psi @ drive lane <br />6" It weight <br />Subtotal - Reinforcing Steel <br />placing <br />spread footings <br />continuous footing <br />interior walis <br />slab on grade <br />4" <br />6" <br />~ columns <br />14,450 Ibs 0.46 6,647 <br />49,085 Ibs 0.46 22,579 <br />0 Ibs 0.50 0 <br />7,000 Ibs 0.50 3,500 <br />17,126 ibs 0.64 10,960 <br />77,700 Ibs 0.48 37,296 <br />2,025 Ibs 0.48 972 <br /> ibs 3.50 0 <br /> Ibs 0.55 0 <br />103,518 Ibs 1.90 196,684 <br />137,066 Ibs 0.48 65,792 <br />3,675 Ibs 1.90 6,983 <br />4,900 ibs 0.48 2,352 <br />0 sf 0.55 0 <br />0 sf 0.55 0 <br />223 cy 18.00 4,014 <br />415 cy 17.00 7,055 <br />14 cy 17.00 238 <br />823 cy 16.00 13,168 <br />136 cy 16.00 2,176 <br />31 cy 38.00 1,178 <br />98,342 I 98,342 <br />32,896 32,896 <br />7651 131.2381 131 <br />6,647 <br />22,579 <br />0 NIC - per struct dtl. (fiberme <br />3,500 <br />10,960 <br />37,296 <br />972 <br />NIC <br />0 <br />0 <br />0 <br />0 <br />6,983 <br />2,352 <br />0 w/ bldg shell or bus mall <br />0 w/ bldg shell or bus mall <br />91,289 <br />4,014 <br />7,055 <br />238 <br />13,168 <br />2,176 <br />1,178 <br />Parking Detail Estimate - Page 3 <br />