Laserfiche WebLink
- --- - - - _ _ . ._ _ -- ---__ __-___ _ - - -_ _ ~ <br />Courthouse Square ~ Architectural Cost Consultants, LLC Estimate Date: R 03-Dec-9 <br />ICOUR $ High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-0ct-98 <br />Satem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 <br />Arbuckle Costic Architects, inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50°k Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />_ _ - - - --- - _ _ _ -_ _ ----- __ _ _ _ _ ----- ----- <br />___ .----- <br />Parking Levet One - ~~~979 --- -- - - <br />Gross Area 71,979 sf _ _ _ <br />- ---- ,.., <br />_ ---- -- --- - - - - --- -- - -- <br />Parkin Quantity _ Unit_Cost/Unit Cost Total __ , , ~ w ~:: ~. °'°:`~~ . Comments <br />--.9 -- _--- -- --- - -- - ----------- <br />_ _ -- ----- <br />-- <br />--- -- ~ ~f- 1 <br />- --- T .. - - -- - __ - ---- -- <br />CONCRETE - Continued <br />Redi-Mix Concrete Continued <br />concrete topping <br />3" 3000psi ~ drive lan 3000 psi <br />6" It weight 3000 psi <br />fibermesh - 1'/ # / cy <br />Subtotal - Redi-Mix Concrete <br />finishing <br />set screeds <br />cure <br />seal <br />trowel <br />float slab <br />finish topping slabs <br />3" 3000psi @ drive lane <br />6" It weight <br />float footings <br />break ties & plug voids @ walls <br />' Subtotal <br />Miscellaneous <br />waterstop - volclay <br />supported slab over vault <br />nw stair wall backup - 8" conc wall <br />house keeping pads <br />Subtotal <br />Precast Concrete <br />nw stair wall <br />precast wheel stops <br />Subtotal <br />------ -- - _ <br />TOTAL-CONCRETE <br />0 cy 66.00 0 0 w/ bidg shell or bus mall <br />0 cy 115.00 0 0 w/ bidg shell or bus mall <br />0 <br />0 cy 8.00 0 veriiy, 11/S8.1.1 vs S5.1.1 <br />_ <br />4,308 cy 299,666 77,478 77,478 144,710 <br />142,707 sf 0.20 28,541 28~~~ <br />142,707 sf 0.08 11,417 11,417 <br />70,548 sf 0.06 4,233 4,233 <br />70,548 sf 0.60 42,329 42,329 <br />72,159 sf 0.40 28,864 14,432 14,432 0 <br />0 sf 0.45 0 0 w/ bldg shell or bus mall <br />0 sf 0.40 0 0 w/ bldg shell or bus mall <br />10,556 sf 0.40 4,222 4,222 <br />31,885 sf 0.55 17,537 17,537 <br />137,142 14,432 14,432 108,279 <br />2,746 If 4.50 12,357 12,357 <br />240 sf 12.00 2,880 2~880 <br />166 sf 18.00 2,988 ~ 2~988 <br />300 sf 8.00 2,400 2,400 <br />20,625 0 0 20,625 <br />166 sf <br />192 ea <br />-_ _ -- _ --- - <br />- -- -- ----_ <br />~ MASONRY <br />30.00 4,980 4,980 <br />0.00 0 0 NIC <br />4,980 0 0 4,980 <br />- --- --------- <br />a1,521,596 $403,355 $403,355 $714,885 ___.____ _ <br />Parking Detail Estimate - Page 5 <br />