My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cost Sharing Models
>
CS_Courthouse Square
>
Cost Sharing Models
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:02:22 AM
Creation date
8/9/2011 10:07:20 AM
Metadata
Fields
Template:
Building
RecordID
10080
Title
Cost Sharing Models
Company
WEGroup Report 1993
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ __. _ _ - -- --------- -------- - ----- -- -------- . . _ _ --. .- -- - <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-Deo-9 <br />Court 8~ High Street James A. Jerde, AIA - Staniey J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />~ <br />50% Contract Documents Estimate ___ _ __ __ _____ . _ Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 59 <br />--- - - - -_ <br /> <br />_ __ - - - <br />_ - -- - - -- - - -- -- <br />- - <br />Bus Mall _ _ _I _Quantity Unit CosUUnit Cost Total ~~~ i` Comments <br />-- ---- - _ <br />_ - - - - - _ _ _ _ - - - - - _ - --------- <br />DEMOLITION <br />_-- _ _ - - --- --.__ --- <br />__ ._ .. -- - <br />demolition sf $0.00 $0 0 NIC - w/ parking & strtscape <br />hazardous material removal sum 0.00 0 0 NIC - By Others (if required) <br />Subtotal $0 $0 $0 $0 <br />_ _____ _ SO $0 $0 $0 <br />TOTAL - DEMOLITION <br />___ __ <br /> <br />- -- <br />SITE WORK <br />--- ---- <br /> <br />Utilities <br />storm drain system <br />catch basins <br />2 ea 650.00 1,300 <br />1,300 <br />ctean outs 6 ea 450.00 2,700 2,700 , <br /> verify sizes <br />piping <br />underslab - 6" 307 If 30.00 9,210 9,210 <br />exposed 6" 47 If 30.00 1,410 1,410 <br />oil / water separator 8,000 <br />1 sum 8,000.00 8,000 <br />Subtotal _ <br />$22,620 $0 $0 $22,620 <br />water system <br />water service for irrigation <br />0 <br />1 sum 0.00 <br />0 <br />NIC <br />Subtotal __ <br />__ <br />$0 $0 $0 $0 <br />electrical <br />electrical systems <br />basic materials <br />1 sum 24,790.00 24,790 <br />24,790 <br />labor 1 sum 31,840.00 31,840 31,840 <br />fixtures 1 sum 95,965.00 95,965 95,965 <br />fire alarm 1 sum 9,979.00 9,979 9,979 <br />permits / mobilization / tools / supervisio 1 sum 6,200.00 6,200 6,200 <br />sub oh & p 15°/a of 168,774.00 25,316 25,316 <br />street lighting ea 0.00 0 0 NIC - see streetscape <br />traffic light sum 0.00 0 0 NIC - see streetscape <br />edestrian street light 0 <br />sum 0.00 0 NIC - see streetscape <br />p <br />Subtotal _ <br />_______ <br />$194,090 $0 $0 $194,090 <br />Landscaping <br />trees @ planters <br />0 ea 0.00 0 0 NIC - none shown <br />~ color spots @ planters 0 ea 0.00 0 0 NIC - none shown <br />ation @ planters <br />irri 0 <br />0 ea 0.00 0 NIC - none shown <br />g _ _____ <br />____ _ 0 <br />Subtotal $0 $0 $0 $ <br />Bus Mall Detail Estimate - Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.