Laserfiche WebLink
_ _ _ _ _ _ _ _ __ _ _ _ - ------- . . . _ . _ _ .. _ _---------------- --- - _ __ _ _ _ -- _ - - _ - - - <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-De~9 <br />COUrt 8~ High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-0ct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Dec-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50°k Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />----- - - - <br />Streetscape __ Quantity. Unit CostNnit Cost Total ,, : Comments <br />Street Fumiture - Continued <br />telephone booths <br />mail boxes <br />banner brackets <br />banners <br />flagpole 8 base <br />Subtotal <br />Canopies <br />east building elevation <br />west buiiding elevation <br />south main entry <br />steel <br />overhead glazing system <br />paint steel <br />south building elevation <br />southwest pavilion / arcade (grid A13) <br />pavilion (grid A10& 10a) <br />clock tower <br />bridge tower (grid 6/7 & O) <br />pavilion (grids 3/3a & A, 3/3a 8~ O) <br />Subtotal <br />Bridges <br />steel ftaming <br />canopy members - WT6 x 20 <br />metal decking <br />paint / finish exposed steel <br />soffit - paint exposed decking <br />gutters <br />Subtotal <br />0 ea 0.00 0 0 NIC - By Others <br />0 ea 0.00 0 0 NIC - By Others <br />60 ea 350.00 21,000 21,000 <br />60 ea 0.00 0 0 NIC - By Others <br />0 ea 0.00 0 0 w/ building shell & core <br />85,850 0 0 85,850 <br />464 sf 41.35 19,186 19,186 <br />174 sf 41.35 7,195 7,195 <br />7,359 Ibs 3.75 27,596 27,596 <br />280 sf 27.30 7,644 7,644 <br />155 If 3.50 543 543 <br />1,682 sf 41.35 69,551 69,551 <br />348 sf 41.35 14,390 14,390 <br />116 sf 41.35 4,797 4,797 <br />58 sf 41.35 2,398 2,398 <br />58 sf 41.35 2,398 2,398 <br />116 sf 41.35 4,797 4,797 <br /> 160,494 0 0 160,494 <br />14.1 ton 2,800.00 39,584 39,584 <br />5.5 ton 2,600.00 14,251 14,251 <br />3,000 sf 2.75 8,250 8,250 <br />4,112 If 3.50 14,392 14,392 <br />3,000 sf 1.00 3,000 3,000 <br />80 If 8.00 640 640 <br /> 80,117 0 0 80,117 <br /> <br />Streetscape Detail Estimate - Page 4 , <br />. <br />