Laserfiche WebLink
_ _ . ._. . _ _ _ ---------- _ - ------ -- ---- --. _ . _ ___ - -- ------- --- ------- --- _ _ - ------- ..___ _ - - - - _ <br />Courthouse Square Architectural Cost Consultants, LLC Estimate Date: R 03-De~9 <br />Court & High Street James A. Jerde, AIA - Stanley J. Ps2czolkowski, AIA Document Date: 29-Oct-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 03-Deo-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:07 AM <br />50°~G Contract Documents Estimate Phone (503) 297-7210 Fax (503) 297-7187 Construction Start: Spring 99 <br />- ----- -- ---- ---- <br />Streetsca e Quanti Unit CosUUnit Cost Total 51 ¢ ~:. w": ~~.,. - omments <br />~- --~ ---.. _ -- -- ---~---- ----__- <br />Arcades / Pavilions / Clock Tower - Continu <br />Arcades <br />SE Arcade @ 10 & 10a from A to A1, 1; <br />concrete columns <br />concrete beam <br />precast concrete base <br />brick veneer <br />buli nose brick accent <br />soldier coursing <br />4" cmu <br />5/8" plywood @ roof deck <br />'/" plywood @ parapet back <br />alumn panel <br />membrane roofing <br />coping / flashing <br />It guage metal framing <br />5/8" gyp sheathing (dens glas shthng) <br />building paper <br />suspended EIFS ceiling system <br />Pavillion @ 3& 3a from A to B, 3& 3a fi <br />concrete columns <br />concrete beam <br />precast concrete base <br />brick veneer <br />bull nose brick accent <br />soldier coursing <br />5/8" plywood @ roof deck <br />Yi' plywood @ parapet back <br />membrane roofing <br />coping / flashing <br />It guage metal framing <br />5/8" gyp sheathing (dens glas shthng) <br />building paper <br />suspended EIFS ceiling system <br />Subtotal <br />TOTAL - SITE WORK <br />& 13 from A to C <br />4.4 cy 1,100.00 4,840 4,840 <br />31.0 cy 850.00 26,333 26,333 <br />620 sf 30.00 18,600 18,600 <br />2,236 sf 18.75 41,925 41,925 <br />154 If 27.00 4,158 4,158 <br />306 If 24.00 7,344 7,344 <br />33 sf 8.00 264 264 <br />1,088 sf 1.35 1,469 1,469 <br />172 sf 1.15 198 ~ 98 <br />246 sf 20.00 4,920 4,920 <br />1,088 sf 5.00 5,440 5,440 <br />200 If 15.00 3,000 3,000 <br />3,582 sf 3.75 13,433 13,433 <br />2,258 sf 1.20 2,710 2,710 <br />2,201 sf 0.10 220 22~ <br />884 sf 6.50 5,746 5,746 <br />~NtoO <br />4.4 cy 1,100.00 4,840 4,840 <br />9.1 cy 850.00 7,768 7.~68 <br />620 sf 30.00 18,600 18,60U <br />2,404 sf 18.75 45,075 45,075 <br />154 If 27.00 4,158 4,158 <br />1, 506 If 24.00 36,144 36,144 <br />630 sf 1.35 851 $5~ <br />240 sf 1.15 276 2~g <br />630 sf 5.00 3,150 3,150 <br />152 If 15.00 2,280 2,28~ <br />3,654 sf 3.75 13,703 13,703 <br />3,024 sf 1.20 3,629 3,629 <br />3,326 sf 0.10 333 333 <br />630 sf 6.50 4,095 4,095 <br /> 447,351 0 0 447,351 <br />~1,552,279 $Uj._ ~ul ~~,S~G,[/y <br />Streetscape Detail Estimate - Page 6 <br />