<br />
<br />-- -- - _ __-- -_ - --
<br />- ---- ------ - -----
<br />---- -- - -----_ _.._
<br />Architecturat Cost Consultants, LL
<br />Courthouse Square
<br /> James A. Jerde, AIA - Staniey J. Pszczolkowski, AIA
<br />Court & High Street 6441 SW Canyon Court, Suite 103
<br />Salem, Oregon PoRland, Oregon 97221
<br />Arbuckle Costic ArchRects, Inc Phone (503) 297-7210 Fax (503) 297-7187
<br />50°~ Contract Documents Estimate __
<br />___
<br />Ground Level - - 2,139
<br />~
<br />COU~' 6,826
<br />Trensit
<br />4,951
<br />Conference Center __
<br />13,916 sf
<br />Total Area
<br />- -- - ----- ~
<br />-- -- :- _ _ _
<br />--- - -- -- - _ - - ---- - ---- ---
<br />Q anti Unit CosUUnit Cost Total ~~ ~ , ,~ ~, ,=
<br />Ground Level Tenant Finishes _ _ _ ____ u__ty_ _ _ _ __
<br />- -- ---
<br />---- -- - _ -- - -
<br />I FINISHES - Continued ~
<br />- -- -- - --- _ - ---
<br />Estimate Date: R 03-Deo-9
<br />Document Date: 29-Oct-98
<br />Print Date: 03-Deo-98
<br />Print Time: 11:07 AM
<br />Construction StaR: Spring 99
<br />~~r~i~;; ° ---- -Comments -_ _ J
<br />Ceilings
<br />instatl only, 2 x 4 ceiling grid & tiles p 652
<br />2 ~
<br />transit 5,525 sf 0.48 2,652
<br />0 ,
<br />483
<br />~
<br />install only, 2 x 2 ceiling grid & tiles 805 sf 0.60 483 981 ~ ~
<br />county 2,044 sf 0.48 981 0 0 ~8
<br />conference center 726
<br />2
<br />450 sf
<br />f 0.48
<br />60
<br />0 348
<br />1
<br />470 0 0 1,470
<br />install only, 2 x 2 ceiling grid & tiles , s . , 0 950 ~
<br />acoustical panels @ transit 119 sf 8.00 950 0 0 520
<br />9
<br />acoustical wall @ conf ctr 1,190 sf 8.00 __ _ 9,520
<br />16,405 981 4,085 ,
<br />11,338
<br />Subtotal
<br />Ceramic Tile
<br />floor tile
<br />480
<br />sf
<br />9.00
<br />4,320 0 4,320 ~
<br />type E
<br />conference center 472 sf 9.00 4,248 0 0 4,248
<br />base
<br />type F
<br />246
<br />If
<br />10.00
<br />2,460 0
<br />
<br />0 2,460
<br />
<br />0 ~
<br />820
<br />1
<br />type E- conference center 182 If 10.00 1,820 ,
<br />wall tile
<br />type F
<br />1,158
<br />sf
<br />8.50
<br />9,843 p 9,843
<br />
<br />0 ~
<br />
<br />412
<br />4
<br />conference center 519
<br />594 sf
<br />sf 8.50
<br />17.00 4,412
<br />10,098 0
<br />0 10,098 ,
<br />~
<br />type G- transit _ 37,201 0 26,721 10,480
<br />Subtotal
<br />Terrazzo
<br />poured in place floor
<br />1,628
<br />sf
<br />11.00
<br />17,908 0
<br />
<br />0 17,908
<br />
<br />125
<br />20 0
<br />
<br />~
<br />inner circle 805
<br />250 sf
<br />If 25.00
<br />18.00 20,125
<br />4,500 0 ,
<br />4,500 ~
<br />base _ _ _
<br />____
<br />42,533 0 42,533 ~
<br />Subtotal
<br />Ground Level Tenant Improvements Detail Estimate - Page 5
<br />
|