Laserfiche WebLink
_ - -- - <br />Courthouse Square <br />Court & High Street <br />Salem, Oregon <br />Arbuckie Costic Architects, Inc <br />50% Contract Documents Estimate_ _ _ <br />Second Floor <br />Total Area _ _ <br />Second Floor Tenant Finishes _ <br />-- - <br />-- -- _-- ----- <br />METALS _ .__ ___ _ .. <br />Miscellaneous metals <br />miscelianeous <br />Subtotal <br />TOTAL - METALS__ ____ __ <br />WOOD <br />--- _ - - - - - _ <br />---- ------- ---- <br />__ _ _ _._----- <br />Architectural Cost Consultants, LLC Estimate Date: R 03-Deo- <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 29-Oct-98 <br />6441 SW Canyon Court, Suite 103 Print Date: 03-DeG98 <br />Portland, Oregon 97221 Print Time: 11:07 AM <br />Phone (503) 297-7210 Fax (503) 297-7187 __ _ Construction Start: Spring 99_ <br />---- - <br />_ ------- ---- <br />- -- 27.462 <br />27,462 sf ___ <br />---- <br />- n~ ~~.,~~+.; - i inrt CosUUnit Cost Totai _ Comments ___ <br />27,462 sf 0.05 1,373 1,373 ~ <br />1,373 1,373 ~ <br />Rough carpentry <br />miscetlaneous blocking 8~ backing 27,462 s <br />Subtotal <br />Finish carpentry <br />chair rail 354 If <br />Subtotai <br />Casework <br />break rooms 2136, 2295 <br />base cabinet 12.0 I <br />counter 6.0 I <br />wall cabinet 12.5 I <br />building inspect reception 2171 <br />36" wide public counter 57.5 I <br />tax reception 2262 <br />base cabinet 28•5 ~ <br />counter 4.0 I <br />deeds <br />island base cabinet 22.0 I <br />peninsula map cabinet 12.0 I <br />counter 12.0 I <br />shelf 12.0 I <br />Subtotal <br />0.05 <br />f 0.05 1,373 1,373 0 <br />- 1,373 1,373 0 <br />8.00 2,832 2,832 ~ <br />2,832 2,832 0 <br />165.00 1,980 ~ .980 ~ <br />95.00 570 570 ~ <br />85.00 1,063 1,063 ~ <br />f 300.00 17,250 17,250 ~ <br />f 165.00 4,703 4,703 ~ <br />f 95.00 380 380 ~ <br />f 250.00 5,500 5,500 ~ <br />f 300.00 3,600 3,600 ~ <br />f 90.00 1,080 1,080 ~ <br />00 216 <br />f 18 216 ~ <br />. <br />----~ 36,341 36,341 0 1.32 <br />_--- ------------ <br />~40,546 <br />--$40,546 <br />--_-__$0 f <br />f <br />f <br />1.48 <br />___- - <br />TOTAL - WOOD & PLASTICS _ _ _ _ - - - -- ----------_--_ <br />Second Floor Tenant Improvements Detail Estimate - Page 1 <br />